Search Permits
20,866 results · type: plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Installation of 120-gallon propane tank, surface mounted securely to wall. 75-ft of 1-in PE gas line buried 18-in with 18-gauge tracer wire from tank to 66k btu grill w/ 2nd stage regulator, 5-ft of 3/4-in galvanized gas line from to 60k btu griddle and 10-ft of 1-in PE gas line from griddle to 270k btu fire pit. Propane tank and gas lines to be installed per 2024 IFGC & FPD 6104.1.
plumbing
plumbing
plumbing
plumbing
plumbing
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Main bathroom: Demolish existing shower pan, walls, fixtures, and glass enclosure: install new shower pan (left drain), fixtures, 3 corner shelves, grab bar, shower window trim kit, treated glass sliding doors: relocate shower drain to left side: no structural change. Main and hall bathrooms: Demolish and replace countertops, integrated sinks, faucets, and under-sink plumbing in main and hall bathrooms: no structural change.
Remove existing vanity cabinets, countertop, two sinks/faucets, large mirror, two vanity lights, and towel rings: Install two vanities, two rectangle sinks, faucets, P-traps, flex lines, and new shut-off valves. No structural change.