Search Permits
247,532 results
ETJ Upgrade from 200 amp. electrical service to 225 amp. electrical service at 13603 Overland pass
Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room are under construction. Once they are completed the Unisex Restroom will be remodeled.
ePlan: Commercial Expedited Review - First Time Finish Out for Restaurant (958 SF).
Irrigation Map
2 bathrooms getting remodeled kitchen flooring and painting throughout. Replace back patio door
Addition of new dwelling unit added above existing garage with 1 bathroom and studio/kitchen space. Existing garage remodel on first floor is being permitted retroactively garage has new facade with existing foundation which was completed around 2019.
Replacement of condenser only BLDG 8
BASE: Installing a backup battery system and additional meter socket.
Remove and replace 3 Ton condenser. Bldg 5
Interior remodel of existing non-complying detached accessory to primary structure to include adding new 1/2 bath.
BASE: Installing a backup battery system and additional meter socket.
Replace underfloor cast iron waste and vent piping with new PVC piping We will tunnel about 10 at each of the two bathrooms on the right of the house. We will stub out and connect to the existing yard line. For the washer(Left rear) and kitchen sink(Rear center) we will tie into the pipe in the wall run down below grade and run around the rear and right side of the house and connect to the existing yard line.(80)
Replacement of complete existing central heat and air system with or without duct work Install 4 Ton 17 seer Gas system with ductwork.
TENANT IMPROVEMENT REMODEL OF AN EXISTING REI RETAIL SPACE. WORK INCLUDES: REPLACEMENT OF RETAIL FIXTURES FINISHES ELECTRICAL AND PLUMBING FIXTURES INCLUDING BUT NOT LIMITED TO RETAIL AREAS CASHIER RESTROOMS STORAGE AREAS AND STORAGE RACKING.
9 square feet of drywall removed. Re-route a water line. Run a cold water line from the kitchen sink to the master bathroom because of a slab leak. We went through the island wall and attic. Total run about 30 feet including going up the walls
BASE: Installing a backup battery system and additional meter socket.
Interior remodel Kitchen and bathrooms remodel removal of 2 non load bearing walls (full scope on application)
Replacement of complete existing central heat and air system with or without duct work upstairs only
Repair broken 2 sewer pipe at right side of back house towards front
Central UPS (Uninterruptible Power Supply) Systems Upgrade (Server rooms IDF MDF) UPS replacements. Installations of new UPSs sub-panels and receptacles for Bldg. B300
PB: New construction of 3 story SFR attached garage covered patio 2nd floor balcony 3 beds 3.5 baths
Building 2 Remove and replace 2.5 Ton condenser. Units 3012 3013
Installing a new irrigation system
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel - Office Area Open Office Areas and Breakout Area.
Verizon installing antennas lines cables and microwave dishes on the existing cell tower. No changes to the tower height.
New 2-story 4 bedroom 5 bathroom duplex residence. Unit 2A contains 2 bedrooms & 2.5 bathrooms with a rear uncovered wood deck.
irrigation install
Replacement of complete existing central heat and air system with or without duct work primary suite system only
BASE: Installing a backup battery system and additional meter socket.