Search Permits
181,475 results
200amp panel replacement. no meter work to be done Austin energy is the electrical provider
Remove existing pool and replace with a new pool with the same specifications.
Express: Replace all windows (like for like) siding and sheathing
Will be upgrading main service to new 200 amp panel and new meter can
Main Panel Upgrade
Interior Non-Structural Demolition
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
Model Home. New construction of SFR Condo with 2 beds 2.5 baths 2 car attached garage and covered front porch. The Garage will be used as a construction office.
Mythic reverse lit channel letters East Elevation
Unit A/ Unit 47 - New construction of Duplex condo each with 3 beds 2.5 baths and attached 2 car garages
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.
New two-story SFR *PRODUCTION BUILDER* with attached garage and covered porch 4/3.5
Addition and interior remodel expired permit 2002-014511 BP will be updated with this project
New Construction 2 Story SFR with attached garage and covered porch and patio- 4bed 3.5bath.
Relocate existing 1-story 1 bedroom 1 bathroom dwelling unit on property to a new location within the property.
Replacement of any self-contained packaged units Replacement of 1x 7.5 Ton RTU at 1835A Kramer Lane Suite 100. This is not a duplicate permit request. Weve done other work at this location in the past.
Install Level 2 EV Charger
Retroactively permit detached 1-story accessory structure (MP and EP only)
ETJ New Construction of a SFR 1458sqft **residential 2 bath house with a kitchen sink and laundry room included.**
Interior remodel see notes attached Dryer vent and exhaust fan in bathroom to be included in scope of work for MP.
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [2bed 3bath] with Attached Garage.
Replacing HVAC system with new upgraded version. Involves new exterior pad new wall penetrations for larger ducts new ceiling tiles in specific areas and new air registers.
THE SCOPE OF THIS PROJECT WILL BE ADDING 293.47 SQF DEAD TIRE STORAGE AND RELOCATE TRASH ENCLOSED.
Express: Remodel to duplex for window replacement (like for like) sheetrock repairs and replacement of electrical outlets interior painting.
Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units Unit 302
QT - Design furnish and install 9 retaining walls at existing school - OVA
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
Express: Foundation repair - Installing 19 pilings
Demolition of interior cmu walls hvac metal roof panel and aluminum storefront. New interior cmu wall hvac roof insulation TPO roof and aluminum storefront.
NEW 1 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO. 4 BED 2 BATH.