Search Permits
258,502 results
Allow housing for one new attached dwelling unit within an existing structure per land use code. Construct alterations to basement for a two-family dwelling per plan.
remove all the signs for ripleys at jefferson st and taylor
remodel @ ground floor: add 2 bedrooms, bathroom and family within existing footprint. approximate 724 sq ft remodel area. structural work included. new window and door @ rear (not street facing)
new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear.remodel existing master bedroom and bathroom on upper unit.
unit #113: interior alteration. partial demolition of one of the kitchen walls and kitchen remodel. upper portion removed,lower portian retained at 3" high with new cap pen detai. 04/a1.1. remove and replace floor finishes with new tile kitchen,corridor, entry and bath. 180 sf approx
to obtain final inspection for work approved under pa# 2023-0711-1884, #2023-0711-1890 and #2023-0711-1891. all work is complete.
excavate west side of property breezeway and access to rear yard and ground floor spaces. revision to 202503071835.
to obtain final inspection for work approved under pa# 2023-0711-1882. all work is complete.
recommencement and completion of work approved under pa# 2019-1231-1068
revision to bpa: 202606243794 -this revision is to remove office -014 and hotelry office -024 from the project scope of work, as well as remove the (e) column at the reception and adding 2 new columns in its place.
revision to pa# 202606173473. provide as built floor plans, delete previosly approved rear deck, replace existing wall finishes with (n) 5/8" type x gyp bd. and add envelope insulation througout.
install 4 stop elevator. ref bpa: 2025.0918.5630
deferred submittal: curtain wall. ref building permit# 202104198808
repair front stairs due to dry rot. remove steps and siding, remove railing to do waterproofing. reinstall handrail and repair siding. less than 50%
evacuation maps for levels 1 and 4 and 6
interior demo and removal of existing lath & plaster, kitchen and baths all rough electrical & plumbing. demo only under this permit.
repair, replacement and addition of new foundations. addition of new walls,floors, ceilings and finishes for new interior spaces on gr fl including new bedroom,bath. lighting,outlets,wiring,plumbing. waste lines prev installed by pw20250617009
the project consists of interior renovation to an existing residence. the scope of work includes the conversion of a portion of the existing garage ans utility room, including an existing bathroom and part of the garage into conditined living space. the scope also includes the installation and modif
proposed exterior wall penatration foir ducting of hvac- existing in field conditions unforeseen until construction start. relocation of louvers due to structure column location.
ti on 5,6,7 & 8 floors. replacement of (1) exterior storefront door & hardware each floor.
revision to pa#202604179664. deck replacement and repair
electrical wiring for ev charger and powerwall and subpanel upgrade (200 amp). we are opening walls to run wires, and patching stucco repair front of the house. plumbing work under plmb-26-2767
revision to pa# 202104198808: remove deferred submittal "shoring & underpinning" and "electrical pole lines and hardware"
1)legalize non-conforming addition at the rear of the top floor 418 sqft. 2) legalize underpermitted work at 2nd fl. interior walls removed and bath removed. all work at upper unit 451 lombard st.
#138: interior tenant improvement with interior layout changes. mep scope includes alterations to electrical systems, plumbing systems, and hvac or ventilation
15th flr: office t.i. of an existing space includes new partitions, mechanical, electrical upgrade. demo under separate permit. restroom upgrade. seperate deferred submission for health review in regards to pntry; beverage station in breakroom.
revision to pa #202602105593. replace 2 foundations at rear, replace slab on grade at rear, and modify walls at living room (interior only)
interior drywall demolition on exterior walls and ceiling. new complete electrical system included, 200a service upgrade. insuation and drywall. 5/8" type x drywall, replace plumbing fixtures in bathroom in same locations. not visible from street.
remodel of existing 3-story with garage, 3 unit apartments including: creation of new ground floor living space for existing 2nd floor unit #505, creation of new interior starway connecting existing 2nd floor unit #505 to new ground floor living space, creation of new 1 hour exit passageway
reconfigure 413 sf of second floor of (e) residence. relocate (e) powder room on 2nd fllor. no incresse in buildiing foot print. no change to exterior.