PermitDig

Search Permits

258,502 results

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

63 ADRIAN AVENUE, Manhattan
8KNov 12

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1420 MORRIS AVENUE, Bronx
8KNov 12

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

2374 UNIVERSITY AVENUE, Bronx
15KNov 12

Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.

120 PARK AVENUE, Manhattan
120KNov 12

PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

1754 FULTON STREET, Brooklyn
9KNov 12

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.

2814 MORRIS AVENUE, Bronx
5KNov 12

REPLACEMENT OF ROOFTOP CONDENSING UNIT WITH A 5 TON CAPACITY. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.

31-31 THOMPSON AVENUE, Queens
18KNov 12

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

516 WEST 169 STREET, Manhattan
8KNov 12

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

808 ADEE AVENUE, Bronx
9KNov 12

TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

31-60 31 STREET, Queens
Nov 12

FILING HEREWITH MODICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

1 ST MARKS PLACE, Manhattan
134KNov 12

Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy

841 BROADWAY, Manhattan
1.4MNov 12

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

1187 OCEAN AVENUE, Brooklyn
5KNov 12

Modifications to the existing HVAC System: Relocate existing Heat Pump unit, cap transfer ducts, install new transfer ducts and fire dampers, cap ductwork, re-balance existing linear diffusers on the 41st Floor as per plans (Salesforce-Make Ready.)

1095 AVENUE OF THE AMERICAS, Manhattan
145KNov 12

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

577 1 AVENUE, Manhattan
0KNov 12

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

1187 OCEAN AVENUE, Brooklyn
5KNov 12

ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

146-16 HILLSIDE AVENUE, Queens
7KNov 12

MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.

116 WEST 14 STREET, Manhattan
Nov 12

MODIFICATION TO EXISTING PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

1 ST MARKS PLACE, Manhattan
55KNov 12

ss

1 TEST STREET, Manhattan
0KNov 12

APPLICATION FILED HEREWITH TO INCLUDE PLUMBING WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OS USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

1 LIBERTY PLAZA, Manhattan
40KNov 12

REMOVAL OF SPRINKLER SYSTEM AND CONVERSION OF STANDPIPES TO DRY PRESSURIZED SYSTEMS IN ASSOCIATION WITH ALTERAION CO APPLICATION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.

95 AMITY STREET, Brooklyn
50KNov 12

ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

85-37 210 STREET, Queens
45KNov 12

Installation of HVAC split system consisting of outdoor condenser units and indoor units in all apartments. No change of use, egress or occupancy under this application

24 EAST 94 STREET, Manhattan
100KNov 12

Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.

133-25 120 STREET, Queens
30KNov 12

INSTALLATION OF A NEW COMMERCIAL KITCHEN EXHAUST SYSTEM, INCLUDING TYPE I EXHAUST HOOD, GREASE DUCTWORK, EXHAUST FAN, AND ASSOCIATED MECHANICAL COMPONENTS. ALL WORK SHALL COMPLY WITH APPLICABLE NYC BUILDING AND MECHANICAL CODES AND APPROVED PLANS.

963 PENNSYLVANIA AVENUE, Brooklyn
35KNov 12

Suspended Scaffold out rigger facade restoration works and inspection.

42-25 LAYTON STREET, Queens
Nov 12

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

507 WEST 113 STREET, Manhattan
Nov 12

Replace existing 45 ton a/c units on the 12 floor., unit serves the interior 12 fl floor of the building with new water cooled a/c units of the same capacity as the 12 fl unit being replaced.

430 PARK AVENUE, Manhattan
300KNov 12

OUTRIGGER FOR FACADE REPAIR.

164-20 HIGHLAND AVENUE, Queens
Nov 12