Search Permits
258,502 results
unit 2902, 3002, 3102: insulation drywall smooth texture, paint wall, set baseboards, paint. no structual changes, like for like, interior only.
revision to pa#202605111060 to include electrical & plumbing for new ground floor drinking foundation. ref mep 202609168187
recommencement and completion of work approved under pa# 202509296318.
3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately.
recommencement and completion of work approved under pa# 202510288299.
remove existing wall and ceiling coverings; replace clawfoot tub with new stall shower; install new shower valve; install new waste line; insulate walls and ceiling; install new drywall; tile shower stall and bathroom floor; install new low flow toilet; install new vanity; install new bathroom
unit# 2w: kitchen and bath remodel w/ plumbing + electrical changes. includes new fixtures, casework, countertops appliances and paint. includes relocating one toilet.
addressing permit: create the address 27 morrell pl
adding drywall to the garage, interior, in kind. adding light fixture will be done by contractor. 58" type x on ceiling and property line wall.
2nd fl patio constructioin of trellis system with integrated lighting and heaters. interior construction of cabinetry, sink, wall finish. plumbing & electrical defered.
revision to #202607024491: mitsubishi minisplit heating/cooling on both floors.
revision to pa 202604300368 2nd fl - (e) bath remodel, add 2 (n) bathrooms, add (n) bedroom, enclose (e) lightwell
removal of existing damaged terra cotta flue liner and replacing with listed class a stainless steel chimney system. this is a repair, not a reconstruction. no roof work seen from street. installed per manufacturer instructions. chimney is listed.
removal of existing damaged terra cotta flue liner and replacing with listed class a stainless steel chimney system. this is a repair, not a reconstruction. no roof work seen from the street. installed per manufcturer instructions. and chimney is listed
removal of existing damaged terra cotta flue liner and replacing with listed class a stainless steel chimney system. this is a repair, not a reconstruction. no roof work seen from street. installed per manufacturer instructions. chimney is listed.
addressing permit: create the address 3209 21st st
1/f: add family room with wet bar, bedroom, 1 full bath and office. 2/f: remodel (e) kitchen, dining and living room. add powder and breakfast nook. 3/f: remodel (e) bedrooms and bathroom. add 1 full bath, office and laundry. new deck at rear.
foundation repair and voluntary strengthening on the ground floor. add plywood shear walls on perimeter walls. replace concrete foundation in kind in the rear walls due to deterioration.
#b, ti: non-struc, to establish auto repair facility within (e) unit b. work to be done in shop is limited to passenger vehicles of internal combustion engines (no ev's), including diagnostic, brakes, suspension, tires, soil/fuilds service & general mech repair. no autobody or commercial vehicles.
to obtain final inspection for work approved under pa# 202109228948. all work is complete.
to obtain final inspection for work approved under pa#202405293239 all work is complete.
chimeney repair.
to obtain final inspection for work approved under 202201045351. all work is complete.
revision to pa# 202606092867: new wetbar in office/non sleeping area on 1st fl.
to obtain final inspection for work approved under pa# 202202077464. all work is complete.
to obtain final inspection for work approved under 202302222413, 202311030159, 202112234995. all work is complete.
to obtain final inspection for work approved under 202302222413, 202311030159, 202112234995. all work is complete.
provision and installation of 3 shield 30 sroiv remote call stations on the 4,5th fl , low rise elevator lobbies along with the 24th fl. highrise elevator lobby. 3 sisou isolator modules at 4,5, 24th fl riser closets.connect new remote call stations to e 2way ecs. program existing 2 way ecs for new
to obtain final inspection for work approved under pa#202204111963 all work is complete.
1st floor ti: renovation of an (e) white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new furniture, and fixtures, new mpe work and fixtures.