Search Permits
258,502 results
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work in conjunction with job #B01455823-I1.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Modification to existing HVAC system as per plans filed herewith. No change in use egress or occupancy.
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Application file to Installing temp 8'-0 high construction fence. All as per plans and applications.
FILE PLUMBING WORK OF 3-FAMILY BUILDING WITH INSTALL NEW/REPLACE/RELOCATED PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILE MECHANICAL WORK AT CELLAR AND 1ST FLOOR OF EXISTING DRINKING AND EATING ESTABLISHMENT TO INSTALL COMMERCIAL KITCHEN EXHAUST HOOD SYSTEM AS PER PLAN. CONSTRUCTION APPLICATION FILED UNDER M01343092-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
HVAC and mechanical modification as indicated on attached plans
Addition of (2) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF A SPRINKLER SYSTEM ON THE 6TH FLOOR AT MT SINAI GP6 EP LAB, AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
KNUCKLEBOOM PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 32 MODULES, 13.12KW
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INSTALL STAINLESS STEEL SMOKE STACK ON THE EXTERIOR OF THE BUILDING.
Plumbing work related to interior rneovation of apartment 2D on the second floor. No change in use, occupancy or egress.
TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 2ND FLOOR (NEW BATHROOMS, PANTRY AND MECHANICAL ROOM) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.