Search Permits
258,502 results
revision to 202405061457, install (n) ada complicant hi - lo drinking fountain. (front building)
floors 3,4,5: revision to permit 202512302985. added employee cafeteria with no prep qnd mk storage on 5/f. made various minor design changes throughout. add 3 phone booths on 3/f. mep included.
revise 202610099258: framing at kitchen due to existing framing running other direction 90%.
interior remodel w/ added roof deck set back 17'-10"from(e)facade.remodel includes a 2'-11" expansion on the 1st fl not extending beyond(e)floor above(n) elec,plum, structural,skylights,& interior finishes.maximum excavation 1'-6",total soil disturbance 12.8 cubic yards for foundation reinforcement.
exterior scope for this core + shell project.the sow is reflective of the approval certificate of apprioatenss and includes replacement of an existing non-historical glass storefront with glass doors in the courtyard, and replacment of an existing roof deck with guard rails and parcel, (2)access
installation of manual pullstations, smoke detectors and horn strobes on all flrs in the common areas installation of low frequency sounders in all sleeping areas to comply with sffc 1103.7.6.1. revision to 202602125866.
installation of manual pullstations, smoke detectors and horn strobes on all flrs in the common areas installation of low frequency sounders in all sleeping areas to comply with sffc 1103.7.6.1. revision to 202602125870.
to obtain final inspection for work approved under pa# 201505297548 and 201307161987. all work is complete.
revision to#202312223026. permit includes screen walls at east and west lightwells, chimney at north side of penthouse, and replacement of existing lightwell stair.
to obtain final inspection for work approved under pa# 202104168747. all work is complete.
to comply with notice of violation 202665021: removing bolt and install emergency signage to exit via door in case of emergency.
revision to permit 202605201631. new racking. new fencing at gantry. new gantry crane and fencing. mep deferred.
recommencement of work approved under pa# 202408098392 fire evac signs.
level 3: interior tenant improvement. includes new partitions. doors, ceilings, and finsihes. mep
installation of manual pull stations, smoke detectors & horns/strobes on all floors in common areas. installation of low freq sounders in all sleeping areas to comply with sffc 1103.7.6.1.
as-built revision to pa# 202602125869: installation of manual pull stations, smoke detectors & horns/strobes on all floors in common areas. installation of wireless low freq sounders in all sleeping areas to comply with sffc 1103.7.6.1.
replace gutters, repair dry rot(several pieces) in various locations at roof. replacement of sun tan skylight. everything in kind, nothing street facing.
rev to pa# 2026-1014-9444: demolish existing wood-burning fire place and remove chimney. replace in kind back door
apartment 1: replace kitchen cabinets and appliances in kind, new electrical. new vinyl flooring. bathroom remodel tub to shower. all plumbing appliances and fixtures in same location. refinish hardwood floors. replace and repair drywall in kitchen and bathroom.
san francisco facade maintenance ordinance, exterior work, scrape off loose paint, window repairs, fire escape ladders will be worked on. remove and patch walls with concrete, prime and paint, street facing, entire building.
replace in-kind dryrot plywood sheathing & cracked stucco at exterior face of 2nd floor parapet wall.
construction of a new parking area and uncovered sand storage space. under separate pa# 202509245990, new maintenance building and administrative offices and associated site work.
permanent removal of underground fuel storage tanks, fuel island and canopy
1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferred
create new opening in two existing concrete wall on the first floor. opening size are 7' wide by 7' tall, and 11' wide by 7'-8" tall (interior load bearing wall)
14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)
deck repair 30% of existing wood decks at 3 levels-none visible from street, in kind. total repair area=approx. 150 sf out of total 375 sf. owner to do some of the work. phone 415-926-0080
7th fl: demo of (e) non-structural partitions, doors and frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped. construction of new non-structural partitions, finishes, ceiling,lighting and plumbing fix
#227: temporary space for victoria's secret & co. replace same wing wall, relocate (e) cashwrap/backwrap from old location, change sign and side wall's. no exterior work. some new partitions.
voluntary soft story seismic upgrade on a basement. underpinning front, rear, and north side of (e) exterior footings. replace 6x10 wood beams & posts (6x6) w/ steel beams and steel posts. new "l" footing between hallway & storage. 4 add (n) shear walls.