to obtain final inspection for work approved under pa#202505025743. all work is complete.
mep deferred for bpa: 202608196841. for tenant improvement of (e) commercial space to a coffee shop.
drywall repair (in-kind) double layer drywall, texture and paint. 8 locations, approx. 4 sq ft each. - south tower (stairway); 14th,6th,7th floor.
recommencement and completion of work approved under pa# 202305026878
remove and reset loose bricks (approx 200sf) at south wall and part of west wall
to obtain final inspection for work approved under pa# 202506178907 all work is complete.
comply to nov#202663644. provide structural strengthening design for existing removed wall on 2nd floor. drywall replacement on 2nd floor.
unit#: 603: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.
l12-tenant improvement includes non-structural partitions, structural strengthening, new interior acoustic ceilings, millwork and finishes. mep included.
unit#: 2217: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.
interior non structural demolition of partitions, ceilings, light fixtures, millwork, finishes, mep. new fit out of core restroooms, new finishes, ceiling and lighting in elevator lobby. the tenant suites will remain unoccupied at the completion of this project.
to obtain final inspection for work approved under pa# 2021-0823-6903, 2025-0408-3952. all work is complete.
strengthening (e) retaining wall between 1854 vallejo and 1751 green st with a new reinforced concrete (shotcrete) retaining wall on concrete grade beam and hand dug piers. approx 27'2" long 10' max. retained height per 2fa, structural engineers plans.to comply with nov#202431088
strengthening (e) retaining wall between 1854 vallejo & 1751 green st with a new reinforced concrete (shotcrete). retaining wall on concrete grade beam & hand dug pier. approx 27'2" long 10 max retained height, per zfa structural engineer plans. special inspection & observation to comply with
comply with nov#202664973 remove unpermitted roof top addition on 2nd fl. no structural alterations.
5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)
replace (e) stucco and stone finish on both sides of garage opening 140 sq ft. with stucco finish to match (e) stucco. provide minor plywood and framing repair and waterproofing.
barrier removal consistin of new accessible all gender toilet.
mep permit for 202603177760.
remodel interior existing drywall and replace with new 5/8" type x drywall, min. 5d cooler , new insulation and paint. remodel (e) (2) bathrooms on the first and second floor. like for like. remodel existing kitchen on the second floor like for like. no wall stud demolition or wall stud construction
g/f - the entire scope consists of accessible barrier removal in accordance w/the 2025 cbc chapter 11b including: 1.accessible upgrade reno of the exterior stairs on webster st, including new treads, risers & handrails. 2.accessible upgrade reno of public restroom & drinking fountains @ 1st fl.
drywall exploratory demo north and south tower trash chute room located on floor 5, approx. 100sqft.
ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment.
restoration and legalization of exterior doors, windows and architectural features. (to abate planning enforcement case no: 2025-012233 enf)
level 1: interior tenant improvement includes new partitions, doors, ceilings, and finishes. mep deferred.
tenant improvement including demolishing of non structural partitions and building new non structuctural partitions and building non structural partitions. all new or reused hvac, elec, plumbing, life safety will be design build.
to obtain final inspection for pa#202405031421 and 202312293257. all work is complete.
replace sheathing and stucoo at front. replace six windows at front, in kind.
(e)bathroom and kitchen remodel. in-kind replacement of (e)equipment. fixture and millwork. elect and plumbing work limited to fiting new fixtures and alignment of outlets. level2: bathroom (e) bathtub, toilet, lavatory and tile wall/flr to be removed. new tiled standing shower, new toilet, new
to obtain final inspection for work approved under pa# 201403130688 & 201405276725. all work is complete.