Search Permits
257,316 results
Installation of new 8.5'curb cut associated with new NB S01360578-I1 & S01360581-I1
EXISTING 1 FAMILY BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK AT THE CELLAR,1ST,2ND FLOOR AND ATTIC UNDER THIS APPLICATION.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
Partial decommissioning and demo of ex'g freight elevator stops and shaft between floors 3-5. New work includes non-structural partitions, and related structural/mep work for remaining constru
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
installation of 252 ln/ ft of new construction fence
Replace the cornice with brick at the parapet level and installation new stucco at facade
FILED TO LEGALIZE A/C UNITS AND WALK-IN BOX COMPRESSORS ON ROOF FOR A 1-STORY COMMERCIAL BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY.
Northwell Health: Extension BH Clinic: rearrange interior, non-bearing partitions, install hung ceiling, wall & floor finishes as per plans filed herewith. No change in use, occupancy or egress under this application.
new interior partitions and finishes in units 10R and 10S on the 9th construction floor as per plans filed. No change in use, occupancy, or egress.
Propose selective removal of minor partitions and finishes. All per plans filed herewith.
Filing subsequent application for installation of mechanical unit and equipment as per plans.
Temporary Installations to be used on a temporary event Walgreens Bench. All the Installations are to be removed upon completion of the events.
HORIZONTAL & VERTICAL ENLARGEMENT OF EXISTING SINGLE FAMILY HOME. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED INTERIOR RENOVATION AT UNIT #2D AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAITON.
INSTALLATION OF ROOF MOUNTED SOLAR PANELS.NO CHANGE IN USE,EGRESS OR OCCUPANCY
FACADE RESTORATION, INSPECTIONS
FACADE INSPECTION VIA INDUSTRIAL ROPE ACCESS
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Installation of 10 RTU replacements on the exact same steel dunnage.
9' TOTAL CURB CUT
GENERAL CONSTRUCTION TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
INSTALLATION OF HEAVY DUTY SIDE WALK SHED.AS PER PLAN.
APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW FD APPLICATION #Q01480677-I1 AND ALT-CO-NB APPLICATION#Q01480733-I1 TO BE FILED. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
RENOVATION OF EXISTING COMMERCIAL SPACE ON PARTIAL FIRST FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLAN: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW PEDICURE CHAIR AND REPLACE ADA RESTROOM AS PER PLAN. MECHANICAL WORK FOR EXH
Installation of new 8.5'curb cut associated with new NB S01352018-I1 & S01352094-I1
PROPOSED NEW CONCRETE ADA RAMP
The Scope of work includes rebuilding brickwork ( Single Wythe), cutting and pointing brick mortar joints in various locations, scraping, priming, and painting steel lintels.
Installing new sink, refrigerator, ice machine and coffee maker and water filter. Installing a drain pump for pantry sink. Connection of plumbing utilities is to base building systems.