Search Permits
247,532 results
THE WOODS AT LINDSEY PLACE PHASE 4, BLK EE, LOT 9
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
etaining Wall Along Back Of Property *Same Plans As 177220*
Provide (N) Exterior A D A Compliant Public Drinking Fountain At The Inverness Public Library.
COB26-00162: Fire loss upstairs exhaust fan in hall bathroom at existing SFR. To rebuild like for like per engineer's report and approved USAA insurance scope of repairs. Truss calculations deferred. No change to square footage. Minimum required building inspections: Electrical and final per Rich Lemcke damage inspection.
New data center civil site improvements. Installation of all off-site improvements and street frontage landscaping during the first phase of construction. Water Meters: (1) 2-inch Landscape meter. Deferred vehicle access gates. REF: PMT26-08422 Bldg 2. Approved with comments. Results in CoC.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 16-FT X 56-FT 2025 CAVCO MANUFACTURED HOME ABOVE GROUND SET, SERIAL NO. CAV2130AZ25-27386A, WITH A/C ON THE SIDE. NO GAS. ONE 13-FT X 40-FT AWNING PER ICCESR 1398. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100% MH FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REMOVAL OF THE MH. PER SECTION 11-34-2(B) OF THE MESA ZONING ORDINANCE, AMENDED IN JULY 2025. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM OF
Renovation of existing tenant space for a new town square facility consisting of complete interior improvement: demolition of select non-bearing walls, ceilings, plumbing and finishes. New construction including select new partitions and ceilings: new restrooms: select electrical and mechanical within the landlord's shell space. No structural or exterior alterations are proposed within this scope. Deferred fire sprinklers and fire alarm.
Construction of detached 614 SF ADU