Search Permits
257,316 results
GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REPAIR/REMOVE/NEW PARTITION, DOOR, CEILING, FLOOR, WINDOW AND PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Construction work on the 53rd floor (prebuild) as indicated on drawings.
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF NEW CURB CUT AS PER DRAWING.
RENOVATION OF EXISTING BASEMENT, 1ST AND 2ND FLOOR WITH GENERALCONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FILING TO ABATE FIRE DAMAGE AT REAR EXTENSION, REAR MAIN BUILDING WALL HEADER, AND ERECTING A REAR DECK AS PER PLANS SUBMITTED HEREWITH.
General construction modifications to the 2nd thru 4th floors as per plans filed herewith. No change in use, egress or occupancy
Installation of legalization of new kitchen exhaust system for new restaurant. Hood and dutwork on first floor kitchen with existing duct penetration working with cooking and commercial district.
Minor Demolition; Removal of interior partitions, doors, finishes and suspended ceilings on the 32nd Floors as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy.
Replace existing siding with Exterior Insulation Finish System (EIFS) at the front and rear walls only.
Installation of temporary trusses & partitions, no alt to exist structures for Wendy's Holiday Box NYC Pop-Up. TPA permit not req. Producer responsible to monitor site safety & implement HWAP. Production equip removed upon event completion.
Alterations to mechanical system in suites on 16th floor as per plans. No change to use, egress or occupancy.
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS AT CELLAR, FIRST FLOOR,AND SECOND FLOOR WITH FACADE RESTORATIONS AND MECHANICAL WORK OF EXISTING 2FAMILY DWELLING UNITS IN 2 STORY WITH CELLAR BUILDING.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
RENOVATION OF EXISTING SUITE, FLOOR REPLACEMENT, WALL REPLACEMENT, AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
temporary construction fence; 8' high at lot lines
MECHANICAL DEMOLITION EQUIPMENT USE
Modifications to the existing HVAC System: Remove ductwork, piping, VAVs, HVAC equipment, controls, air outlets on the 32nd Floor as per plans (Holland & Knight - Demo Phase.) No change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work or inspection.
PROPOSED NEW FOUR STORY AND CELLAR COMMUNITY FACILTY SCHOOL BUILDING.
MECHANCIAL MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Modification of mechanical on 15th & 16th floors as per plans. No change in use, egress or occupancy.
REGISTER ONE RANGE/OVEN, TWO GAS DRYERS AND WASHING MACHINES.
Filing for plumbing fixtures with associated waste and water lines , and gas equipment with gals lines and associated valves.
underpinning design for 4 story building with cellar.
FILING HEREWITH STRUCTURAL PLANS SHOWING NEW STAIR AND ASSCIATED REINFORCEMENT. NEW SLAB OPENING AT 30TH FLOOR AND ASSOCIATED REINFORCEMENT. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
KNUCKLEBOOM PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
INTERIOR RENOVATIONS FOR FLOOR 02.; REMOVE AND REPLACE INTERIOR NON BEARING PARTITIONS, INSTALLATION OF NEW FLOORING, PATCH REPAIR AND PAINT SURFACES AS REQUIRED. THE EXISTING STRUCTURAL SHALL NOT BE ALTERED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION WITH PARTITION WORK FOR BUTTER UP AT 1ST FLOOR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.