Search Permits
19,714 results · type: electrical
Wire new in ground pool
6 Month vacancy inspection. No new work performed at the property.
Electrical Service/Meter for Apt. 119
Vacancy
electrical
electrical
electrical
electrical
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
Electrical
Electrical
Electrical
Electrical
Complete residential rewire to modern NEC standards, including upgrading the Load Center to 200-amp capacity, new branch circuits, AFCI/GFCI protection, and upgrading grounding/bonding system to comply with the 2023 NEC, 2024 IRC and Mesa amendments.
Vacancy Inspection
Complete wire and low voltage.
vacancy
Repairs and service release restore power
Relocate existing receptacles, light fixtures and switches
Electrical service permit for common areas at 4420 Dauphine St.
Six month vacancy inspection
Vacancy inspection to have power back
electrical