PermitDig

Search Permits

255,875 results

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

42-15 CRESCENT STREET, Queens
1KNov 6

INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

712 GUN HILL ROAD, Bronx
75KNov 6

INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

819 GRAND STREET, Brooklyn
10KNov 6

INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

9820 62 DRIVE, Queens
13KNov 6

TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

395 SOUTH END AVENUE, Manhattan
6KNov 6

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

147 WEST 46 STREET, Manhattan
5KNov 6

PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN AND 1 NON-ILLUMINATED ACCESSORY BUSINESS SIGN. THE FIRST SIGN WORDING THE SEA FIRE GRILL THE SECOND SIGN WORDING 216 E

216 EAST 49 STREET, Manhattan
3KNov 6

RENOVATION TO EXISTING 2 STORY BUILDING. NO STRUCTURAL WORK PROPOSED.

1240 COLLEGE AVENUE, Bronx
266KNov 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

100 HALE AVENUE, Brooklyn
1KNov 6

INSTALLATION OF TEMPORARY SCAFFOLD. IN ACCORDANCE WITH 2022 NYC CC CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

256 BROADWAY, Manhattan
1KNov 6

ALTERATION TYPE 3 - INSTALL SUPPORTED PIPE SCAFFOLDING AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.

16-63 CODY AVENUE, Queens
20KNov 6

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

215 EAST 12 STREET, Manhattan
1KNov 6

Installation of temporary heavy duty sidewalk shed and scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

204 WEST 78 STREET, Manhattan
0KNov 6

IRA FISP INSPECTION

167 CHRYSTIE STREET, Manhattan
Nov 6

Installation of temporary heavy duty sidewalk shed and scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

204 WEST 78 STREET, Manhattan
0KNov 6

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

1725 WEST FARMS ROAD, Bronx
3KNov 6

INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.

2080 CAESAR PLACE, Bronx
5KNov 6

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.

18 BEAVER STREET, Brooklyn
1KNov 6

INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CARS1&2 SHALL BE 7000# CAPACITY DURING NEW BUILDING CONST FILED SEP. HOISTS SHALL COMPLY WITH THE 2022 BLDG CODES, CH #33. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP ELEV APPL FILED SEP

138-38 37 AVENUE, Queens
25KNov 6

INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

45 WEST 60 STREET, Manhattan
3KNov 6

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

21 EAST 3 STREET, Manhattan
5KNov 6

PROPOSED INSTALLATION OF 1 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN. WORDING REDEFINE MEAL PREP

271-10 UNION TURNPIKE, Queens
3KNov 6

INSTALLATION OF SYSTEM SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

413 EAST 120 STREET, Manhattan
10KNov 6

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

101 ST MARKS PLACE, Manhattan
5KNov 6

EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY

94-09 148 STREET, Queens
10KNov 6

INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

3444 WHITE PLAINS ROAD, Bronx
65KNov 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

157 GREEN STREET, Brooklyn
1KNov 6

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

560 WEST 43 STREET, Manhattan
5KNov 6

TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

910 EAST 172 STREET, Bronx
1KNov 6

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

102-50 62 ROAD, Queens
50KNov 6