PermitDig

Search Permits

19,714 results · type: electrical

Addition and/or Alteration

5247 N SYDENHAM ST, Philadelphia
Apr 24

Addition and/or Alteration

6145 IRVING ST, Philadelphia
Apr 24

Addition and/or Alteration

104 LOMBARD ST, Philadelphia
Apr 24

Addition and/or Alteration

2908 W GIRARD AVE, Philadelphia
Apr 24

electrical_permit_(c)

4612 BENNINGTON AVE, Baton Rouge
Apr 23

electrical_permit_(r)

23514 SUNNYSIDE LN, Baton Rouge
Apr 23

Electrical

551 Boylston ST, Boston
25KApr 23

Electrical

6 O ST, South Boston
5KApr 23

Electrical

11 Euclid ST, Dorchester
10KApr 23

Electrical

175-177 Hillside ST, Mission Hill
1KApr 23

Electrical

112 Perkins ST, Jamaica Plain
10KApr 23

Electrical

276 Geneva AV, Dorchester
140KApr 23

Electrical

220 Magnolia ST, Dorchester
3KApr 23

Electrical

804 Hyde Park AV, Hyde Park
500KApr 23

Electrical

2599-2601 Beacon ST, Brighton
135KApr 23

Electrical

383-385 Blue Hill AV, Dorchester
2KApr 23

Electrical

804 Hyde Park AV, Hyde Park
2KApr 23

Electrical

354-364 Longwood AV, Boston
88KApr 23

Electrical

354-364 Longwood AV, Boston
55KApr 23

Electrical

1872-1876 Centre ST, West Roxbury
2KApr 23

Electrical

55 Temple PL, Boston
15KApr 23

Electrical

1 Liberty SQ, Boston
100KApr 23

Electrical

78 Park ST, West Roxbury
12KApr 23

Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit Replace existing exterior electrical service equipment with new 200-amp Eaton meter/main in same location. Upgrade service entrance conductors, grounding, and bonding to meet current

718 W GROVE CIR, Mesa
Apr 23

PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF

644 S SAN JOSE, Mesa
Apr 23

PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF

7941 E NARANJA AVE, Mesa
Apr 23

PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

3446 E DOWNING ST, Mesa
Apr 23

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

4937 E ELENA AVE, Mesa
Apr 23

Replace existing 100A electrical service panel with new 200A service panel. Install new 60A sub-panel to replace improperly installed circuit in enclosed former carport. All work to be performed per SRP requirements, the 2023 NEC, 2024 IRC and Mesa amendments.

7554 E DEWBERRY CIR, Mesa
Apr 23

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

8347 E PUEBLO AVE, Mesa
Apr 23