PermitDig

Search Permits

255,875 results

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

15 7 AVENUE, Brooklyn
13KNov 13

INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. NO CHANGES IN THE MEANS OF EGRESS.

192 DOUGLASS STREET, Brooklyn
Nov 13

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

930 BEDFORD AVENUE, Brooklyn
1KNov 13

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

325 EAST 116 STREET, Manhattan
5KNov 13

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

173 WEST 81 STREET, Manhattan
1KNov 13

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

341 WEST 44 STREET, Manhattan
7KNov 13

INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.

27 MAY AVENUE, Staten Island
Nov 13

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

241 EAST 17 STREET, Manhattan
5KNov 13

Installation of a temporary supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

642 BALTIC STREET, Brooklyn
5KNov 13

Mechanical work in conjunction with job #B01455823-I1.

15 PARKVILLE AVENUE, Brooklyn
45KNov 13

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

171 WEST 81 STREET, Manhattan
1KNov 13

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

106 WEST 134 STREET, Manhattan
1KNov 13

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

212 WEST 71 STREET, Manhattan
8KNov 13

SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

161-16 129 AVENUE, Queens
20KNov 13

Modification to existing HVAC system as per plans filed herewith. No change in use egress or occupancy.

25 MADISON AVENUE, Manhattan
73KNov 13

INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.

31 MAY AVENUE, Staten Island
Nov 13

SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

72-44 141 STREET, Queens
50KNov 13

Application file to Installing temp 8'-0 high construction fence. All as per plans and applications.

120-14 193 STREET, Queens
8KNov 13

FILE PLUMBING WORK OF 3-FAMILY BUILDING WITH INSTALL NEW/REPLACE/RELOCATED PLUMBING FIXTURES AND GAS APPLIANCES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1819 WEST 8 STREET, Brooklyn
Nov 13

INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

50 MOLLENHAUER DRIVE, Brooklyn
3KNov 13

FILE MECHANICAL WORK AT CELLAR AND 1ST FLOOR OF EXISTING DRINKING AND EATING ESTABLISHMENT TO INSTALL COMMERCIAL KITCHEN EXHAUST HOOD SYSTEM AS PER PLAN. CONSTRUCTION APPLICATION FILED UNDER M01343092-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

47 WEST 55 STREET, Manhattan
60KNov 13

ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.

148-09 115 AVENUE, Queens
63KNov 13

HVAC and mechanical modification as indicated on attached plans

55 WATER STREET, Manhattan
2.3MNov 13

Addition of (2) fire hose valves to existing standpipe system. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

825 THIRD AVENUE, Manhattan
30KNov 13

INSTALLATION OF A SPRINKLER SYSTEM ON THE 6TH FLOOR AT MT SINAI GP6 EP LAB, AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.

1468 MADISON AVENUE, Manhattan
162KNov 13

Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.

32-20 205 STREET, Queens
22KNov 13

KNUCKLEBOOM PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.

343 MADISON AVENUE, Manhattan
13KNov 13

INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 32 MODULES, 13.12KW

202 WATCHOGUE ROAD, Staten Island
66KNov 13

INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

2800 HEATH AVENUE, Bronx
205KNov 13

INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.

295 WADSWORTH AVENUE, Manhattan
246KNov 13