Search Permits
255,875 results
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
INTERIOR RENOVATION OF ONE FAMILY DWELLING UNIT. NO CHANGES TO THE EXISTING USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION.
INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE MEANS OF EGRESS.
IRA FISP Inspection/ Repairs
RESTORE CELLAR TO THE PREVIOUS LEGAL CONDITION AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
MECHANICAL MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
filed herewith; proposed 10' curb cut
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES iN 1ST AND 2ND FLOOR; NEW 2-PC RESTROOM, WASHER, DRYER, BOILERS AND HOT WATER HEATERS iN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS AP
Minor slab openings for proposed electrical equipment and conduit as per plans filed herewith. No change in use, egress or occupancy under this application.
MINOR INTERIOR WORK IN 2 FAMILY BUILDING WITH REPLACE DOOR, REPAIR PARTITION, CEILING AND PAINTING AS PER PLAN.NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
Removal of existing AC units and piping
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
PLUMBING MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTON (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Direct Replacement of (2) 5-ton rooftop air-conditioning units on existing steel dunnage. Reconnect to existing ductwork and utilities.
Propose plumbing for existing 1 family residence as per the plan submitted herewith. No change in use, egress, or occupancy under this application.
GENERAL RENOVATION OF A EXISTING STORE IN A MIX-USED BUILDING WITH REPAIR/REPLACE/NEW PARTITION, DOOR, CEILING, FLOOR, WINDOW, PAINTING & MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Comprehensive interior tenant alteration and fit-out of the entire single-tenant commercial office floors 030 (031M), 031 (032M), 032 (033M) to accommodate a corporate office space layout. No change in use, egress or occupancy.
interior renovation
INTERIOR RENOVATION OF 27TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF FIRE SPRINKLER HEADS AND FIRE SPRINKLER PIPING
INSTALL AND RELOCATE PLUMBING FIXTURES AND GAS EQUIPMENT, AND RE-PIPE GAS LINES THROUGHOUT BUILDING.
Exterior facade repairs: brick replacement/repointing, coping stone replacement, concrete patch repairs, shelf angle refurbishment, sill replacement, railing/post flashing, and coatings per plans.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
PARTIAL INTERIOR RENOVATION OF PORTION OF EXISTING TENANT FL. INCLUDES REMOVAL OF EXISTING NON-STRUCTURAL PARTITIONS, FL FINISHES, SUSPENDED CEILING & RECONSTRUCTION OF INTERIOR NON-STRUCTURAL PARTITIONS/FINISHES. NO CHANGE IN OCCUPANCY, USE, OR OCCUPANCY
Installation of temporary fence in conjunction with X00970752 and X01161054
MODIFY PLUMBING SYSTEM AND INSTALL NEW SPRINKLER SYSTEM FOR NEW ENLARGED 4-STORY RESIDENTIAL BUILDING SUBSEQUENT WITH A1 JOB#B01262033.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Temporary structures for a red carpet event at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
IRA Facade inspections as per the plans