Search Permits
255,875 results
installation of construction fence to protect site, during HPD & DOB AED demolition
Installation of solar electric generation system for utility interconnection. No changes being made to use, occupancy, egress, or anything not marked on the planset and supporting documents
Installation of material hoist and suspended scaffold for facade inspection/repair.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR DEMO BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
Installation of suspended scaffold for facade repair & inspection.
INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ALUMINUM FRAME WITH VINYL MESH AS PER PLANS FOR TAMAGOTCHI EVENT.
INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL HVAC SPLIT SYSTEM FOR GARAGE SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Knuckleboom use for building construction
INSTALLATION OF A MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
TEMPORARY ROOF PROTECTION AS PER DRAWINGS. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED, PLYWOOD FENCE, ROOF PROTECTION AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR NEW BUILDING CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
CHNY 5 PHARMACY. STRUCTURAL FRAMING TO ACCOMMODATE ALTERATIONS TO THE PHARMACY IN THE EXISTING HOSPITAL BUILDING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
SUBSEQUENT FILING MECHANICAL SYSTEM WORK. INSTALL SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION FILED UNDER APPLICATION #M01173090. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Temporary Construction Fence on Sidewalk and Street.