Search Permits
255,875 results
remodel interior existing drywall and replace with new 5/8" type x drywall, min. 5d cooler , new insulation and paint. remodel (e) (2) bathrooms on the first and second floor. like for like. remodel existing kitchen on the second floor like for like. no wall stud demolition or wall stud construction
g/f - the entire scope consists of accessible barrier removal in accordance w/the 2025 cbc chapter 11b including: 1.accessible upgrade reno of the exterior stairs on webster st, including new treads, risers & handrails. 2.accessible upgrade reno of public restroom & drinking fountains @ 1st fl.
drywall exploratory demo north and south tower trash chute room located on floor 5, approx. 100sqft.
ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment.
restoration and legalization of exterior doors, windows and architectural features. (to abate planning enforcement case no: 2025-012233 enf)
level 1: interior tenant improvement includes new partitions, doors, ceilings, and finishes. mep deferred.
tenant improvement including demolishing of non structural partitions and building new non structuctural partitions and building non structural partitions. all new or reused hvac, elec, plumbing, life safety will be design build.
to obtain final inspection for pa#202405031421 and 202312293257. all work is complete.
replace sheathing and stucoo at front. replace six windows at front, in kind.
(e)bathroom and kitchen remodel. in-kind replacement of (e)equipment. fixture and millwork. elect and plumbing work limited to fiting new fixtures and alignment of outlets. level2: bathroom (e) bathtub, toilet, lavatory and tile wall/flr to be removed. new tiled standing shower, new toilet, new
to obtain final inspection for work approved under pa# 201403130688 & 201405276725. all work is complete.
unit 3: drywall and tile only in the shower, repair + replacement in kind. to partially comply with nov# 202663817.
ste 900: office tenant retrofit, lighting with associated circuits & controls, power & signal with associated circuits & wiring.
remove & dispose of asbestos roofing materials from the above project location as identified & quantified by safe air environmental on 10/7/2026. this work is associated with the permit for demolition of building under permit #202507291824.
administrative permit to document the legal use and occupancy of structure as a single family residence with 1 story over a basement. this determination is based on a review of records including sanborn map, assessors record and dbi site visit. no work on this permit.
to replace the knob + tube wiring in attic with romex. to remove the existing attic insulation, then add new attic insulation when the wiring is complete. to remove attic heat ducts before the insulation work, then replace the attic heat ducts with the ones that got removed.
solar permit: mounted: roof, ballasted: n, including 3 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | install 3 tesla powerwall 3 as part of a stand-alone backup power system
ste 415 tenant improvement to include demolition of non-structural partitions & ceiling partitions, ceiling power and finishes. corridor and elevator lobby scope to include new finishes. mep/fire alarm systems/fire sprinklers/ signage deferred
ed13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair.
demo bathroom tub and tiles, replaced shower valve and build new shower pan, adding outlet for toilet and new lights, new vanity.
plumbing
mechanical
electrical
plumbing
short_term_rental
building
electrical
mechanical
electrical
plumbing