Search Permits
253,630 results
INSTALLATION FOR STRUCTURAL SUPPORT FOR HVAC SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
New wall partition in existing commercial space to create new layout for new tenant.Minor electrical work.No change in use , occupancy or means of egress
INTERIOR RENOVATION OF STORES. WORK INCLUDES CAP AND REMOVE SINK AND BUILD NEW BATHROOM . NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
RENOVATION OF RETAIL STORES. WORK INCLUDES NEW DEMISING WALL FOR STORES AND BUILDOUT OF BATHROOM. NEW LIGHTING FOR PROPOSED BATHROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Installation of solar panels, rooftop, grid tied, railed, 13 modules, 5.33 KW
INTERIOR RENOVATION OF THREE DWELLING UNITS AT THREE STORY BUILDING. REMOVE NON-STRUCTURAL PARTITIONS, RELOCATE KITCHENS, INSTALL NEW FLOORS AND NEW BATHROOM PLUMBING FIXTURES. CLOSE SHAFT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 6 TON WATER SOURCE HEAT PUMP UNIT IN FLOOR 001 CIELING. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
Sound and replace driveway ceiling tiles as required.
Sprinkler modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Apt 16F: Interior Renovations as per plans filed herewith. No change to use, egress or occupancy
INSTALL NEW PLUMBING FIXTURES ON 1ST FLOOR
Propose to perform an interior renovation work in the Apt. 1B on First floor such as repair damaged wall surfaces, polish the wood floors, install new wall and floor ceramic tiles and painting. No change in the USE, egress and occupancy.
Interior Partition Changes. Install Flooring. Replace Windows. No Change to use or egress. all in Apt 15N
PARTIAL RENOVATION OF 3RD FLOOR SPACE. CONSTRUCTION INCLUDES THE REMOVAL OF NON- LOAD BEARING INTERIOR PARTITIONS, NEW MILLWORK, HARDWOOD FLOORING AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INCLUDED IN THIS APPLICATION
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS
removal of interior plumbing and sprinkler fixtures/piping with temp loop installed on 40th floor
INTERIOR RENOVATION OF 8TH FLOOR APARTMENT UNIT 8AB. RELATED NON-LOAD-BEARING PARTITION CHANGES. NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
Renovate 4-kitchens and 4-bathrooms and replace or install new fixtures and remove and replace all associated pipes (h & C water lines, W&V pipes). Remove 2-gas meters and h.w. tank from cellar & 4-res. ranges and all asociated pipes. All as per plans.
PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON CELLAR & 1ST FLOOR, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
Provide sanitary facilities for office space as per plans filed
sprinkler modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupancy
Proposed bracing work filing #B01279285-S1 in conjunction with FD Filing #B01279285-I1. Filing to Address Violations: V 081125EGNCY19444
Proposed bracing work filing #B01279103-S1 in conjunction with FD Filing #B01279103-I1. Filing to Address Violations: 39543159X
removal of shower stall /toilet/sink /utility sink at cellar level, cap/remove
REPLACEMENT OF EXISTING WOODEN JOISTS ON FIRST FLOOR WITH NEW COLD-FORMED STEEL JOISTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.