Search Permits
253,630 results
unit#1404: interior remodel: replace plumbing fixtures. install shower grab bar backing. add local smoke alarm at sleeping room and living roomentry area. no exterior work.
replace fire alarm system to meet sf/ca code + add lf horn in units + add wireless radio monitor.
front building: renovation of 1 apartment unit#254 on first level. new bedroom, office and bath.new kitchen cabinets & plumbing fixtures, new dishwasher & washer/dryer.new office, new lighting at (e)j boxes, no change to mechnical, no exterior work, fire alarm or sprinkler work.no structural work.
new garden deck in front of the building
modify existing fire alarm system to comply w/ sffc-2016 sec 1103.7.6.1, fire alarm system will not meet current 2022 cbc abd cfc and nfpa 72-2022, install low freq sounders in all sleeping areas.
solar permit: installing 16 solar pv modules, 440 watts per module, total no. of rating 7.04 kw. mounted: roof, ballasted: n, including 2 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | revision to relocate equipment in perm
convert a garage to a new adu 371 sq ft, studio with kitchen,bathroom,laundry & living space.
(1)kitchen and (1) bathroom remodel, like to like, electrical rewiring. no layout changes
(n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain.
removal of (e) non bearing walls and (n) flooring, replace (e) doors and hardware at office. removal of door to bathroom for accessible access. no exterior work
addressing permit only: retire the addresses 345 a & 347 03rd ave from apn 1435/007.
4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred.
install 2 (n) containment solutions fiberglass (csi) 12000 gallons ust's- 1-1200gal for 87 products and 1-12000gal for 890 product and split tank for 2x6k gal tanks for 91 product and 6k for diseasel. pre install (e) four (4) dispose. install (n) nov double wall piping, ancillary equipment finaltest
reroof, no hot works.
reroof no torch
install a new nfpa 13 wet automatic sprinkler system to accommodate the floor plan layout.
plumbing
plumbing
New Construction
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
New Construction
Make Safe Permit For RP
EZ Roof Covering Replacement
New Construction
New Construction or Additions
Addition and/or Alteration