PermitDig

Search Permits

19,582 results · type: electrical

electrical_permit_(r)

427 MAYFLOWER ST, Baton Rouge
Apr 28

electrical_permit_(r)

2211 IDLE OAKS DR, Baton Rouge
Apr 28

electrical_permit_(r)

4530 BEECH ST, Baton Rouge
Apr 28

Electrical

149 Newbury ST, Boston
20KApr 28

Electrical

36 Prince ST, Jamaica Plain
4KApr 28

Electrical

311 Commonwealth AV, Boston
1KApr 28

Electrical

2 Sunderland ST, Dorchester
2KApr 28

Electrical

570 Rutherford AV, Charlestown
52KApr 28

Electrical

10 Shattuck ST, Boston
21KApr 28

Electrical

209 Beacon ST, Boston
80KApr 28

Electrical

300 Boylston ST, Boston
233KApr 28

Electrical

179 Longwood AV, Boston
30KApr 28

Electrical

17 Rawston RD, Roslindale
10KApr 28

Electrical

590-590A Tremont ST, Roxbury
3KApr 28

Electrical

26 Windham RD, Hyde Park
6KApr 28

Electrical

50 Montclair AV, Roslindale
8KApr 28

Electrical

100 Tyndale ST, Roslindale
9KApr 28

This permit is to upgrade to a 225A MAIN PANEL SERVICE with installation of ONE TESLA POWERWALL 3 BATTERY. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. S

7539 E CAPRI AVE, Mesa
Apr 28

INSTALLATION OF A NEW 240 VOLT 50 AMP DEDICATED CIRCUIT BREAKER NEMA 14/50 OUTLET FOR EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. CHARGE-POINT STATION SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2018 IBC, 2017 NEC AND SRP STANDARDS.

2623 S PATTERSON, Mesa
Apr 28

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

2511 E JACINTO AVE, Mesa
Apr 28

PERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLINWH APOWER2 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F

9705 E GREENWAY ST, Mesa
Apr 28

PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF TWO TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF

4134 E DOLPHIN AVE, Mesa
Apr 28

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

1541 W 7TH PL, Mesa
Apr 28

Wire- 125 Amp Serv Panel & 16 Branch Circuits.

4503 Constance St, New Orleans
Apr 28

Wire New Duplex

400 Diana St, New Orleans
Apr 28

PULL VACANCY PERMIT Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property.

5025 Mexico St, New Orleans
Apr 28

Full electric renovation, all wire and code update. Changing a 3plex electric to a single house

1040 Cadiz St, New Orleans
Apr 28

UPGRADE ELECTRICAL SERVICE TO 200AMP AND ADD 10 CIRCUITS FOR RENOVATION

301 Tricou St, New Orleans
Apr 28

Electrical vacancy

6028 Canal Blvd, New Orleans
Apr 28

Power has been off for 6 month.

2223 Jena St, New Orleans
Apr 28