Search Permits
252,467 results
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
RECONNECT GAS PIPING FOR DIRECT REPLACEMENT OF TWO (2) PACKAGE ROOFTOP HVAC UNITS.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 2nd floor (Paradigm) as per plans. No change to use, egress or occupancy.
Hereby filing to to install and modify ductwork and piping for showroom renovation as shown on plans filed herewith. No change to use, occupancy or egress.
interior renovation to existing CVS Pharmacy to replace finishes (floor, wall, ceiling) Modify and relocate checkout and photo counters. Modify retail fixtures layout, replace and relocate lights, No change to egress, exits, occupancy or use.
FILING HEREWITH PLANS AND APPLICATION FOR PLUMBING FIXTURES IN PROPOSED ICE CREAM PARLOR IN EXISTING COMMERICAL SPACE. JOB FILED IN CONJUNCTION WITH X01405942-I1
Legalize full demolition of a garage.
INSTALLATION OF NEW SPRINKLER SYSTEM FOR THE ENTIRE BUILDING.
Conversion of two-family to one-family building. New interior stair connecting First Floor and Basement, new structural elements to support existing first floor at the new stair opening, conversion of an existing kitchen into bathroom.
PLUMBING WORK ON 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Foundation Work
Hands-on FISP inspection
INSTALLTION OF SPLIT UNIT AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Roof replacement, new stair installation with facade repairs (repointing, brick, sill, furnish splash block, removal of unused pipe penetration & dunnage as per plans herewith No change in use, egress or occupancy.
Modification to non load bearing partitions. new finishes. new built-in cabinetry.
MPP #326. General construction as shown on plans filed herewith. No change in use, egress or occupancy.
16F: Installation of plumbing fixtures as per plans filed herewith. No change to use, egress or occupancy
Installation of New Steel Beams, Columns, Decking and Concrete Footing for Existing Car Ramp on First Floor. No Change in Use, Occupancy or Egress.
PLUMBING WORK IN CONJUCTION WITH PROPOSED ADA BATHROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
SCOPE OF WORK TO INCLUDE INTERIOR RENOVATION TO EXISTING COMMERICAL TENANT SPACE, NEW FINISHES, NEW NON BEARING PARTITIONS, NEW MILLWORK COUNTER, NO CHANGE IN USE, EGRESS AND OR OCCUPANCY UNDER THIS APPLICATION
CSC STORE #24487 BUILDOUT OF EXISTING EATING AND DRINKING ESTABLISHMENT RESTAURANT, INCLUDING INSTALLATION OF CEILINGS, MILLWORK AND EQUIPMENT. WORK WILL ALSO INCLUDE CONSTRUCTION OF BULKHEAD. THIS APPLICATION TO SUPERSEDE 420968956. CHANGE IN USE OCC EGR
REMOVE 1 SPRINKLER HEAD AND PIPING. RELOCATE 17 SPRINKLER HEADS AND PIPING.
FILE NEW 10' DROP CURB WITH 1'-6 SPLAYS ON BOTHSIDE
PROPOSED MECHANICAL PLANS FILED HEREWITH.
INTERIOR RENVATION OF THE GROUND FLOOR TAKE OUT FOOD STORE WITH EXISTING COMMERICAL KITCHEN HOOD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Facade Repair, including Lintel Replacement, Repointing Brick, Brick Replacement and Caulking as per plans. No change to use, egress or occupancy under this application. (Dartmouth Building)
T-Mobile: Installation of additional antennas and RRUs with installation/removal of kickbacks on the roof. Installation and removal equipment cabinets in the platform on the roof. All work is in compliance with TPPN 5/98. No change in use/egress/occupancy
Cosmetic finishes for floor, walls, and ceiling. Installation of lighting fixtures... No change in egress, occupancy, or use under this application.
Install sprinklers as per plans. Install new standpipe system as per plans. No change in use, egress or occupancy.
PLUMBING WORK IN NEW 3-STORY BUILDING WITH ATTIC, IN CONJUNCTION WITH NB APPLICATION # X01290994-I1