PermitDig

Search Permits

247,532 results

Plumbing

117 Park DR, Boston
5KOct 7

Plumbing

109 Queensberry ST, Boston
4KOct 7

Plumbing

15 Queensberry ST, Boston
5KOct 7

Plumbing

15 Queensberry ST, Boston
6KOct 7

Electrical

14-14R Kennebec ST, Mattapan
8KOct 7

Electrical

39 Hewins ST, Dorchester
8KOct 7

Electrical

26-28 Cedar PK, Roxbury
6KOct 7

building:_alteration_and_addition

950 Massachusetts Ave, Cambridge, MA 02139, Cambridge
Oct 7

building:_alteration_and_addition

43 Cameron Ave, Cambridge, MA 02140, Cambridge
Oct 7

building:_alteration_and_addition

87 Cambridgepark Dr, Cambridge, MA 02140, Cambridge
Oct 7

building:_alteration_and_addition

47 Moulton St, Cambridge, MA 02138, Cambridge
Oct 7

building:_alteration_and_addition

75 RICHDALE AVE, Unit 6, Cambridge, MA 02140, Cambridge
Oct 7

INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 9.085 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF HOME. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817.

7631 S ADA ST, Chicago
Oct 7

ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/7/2026. END DATE: 11/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.

350 E SUPERIOR ST, Chicago
Oct 7

ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: EDUCATION. START DATE: 10/7/2026. END DATE: 11/6/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.

710 N LAKE SHORE DR, Chicago
Oct 7

ALTERATION OF EXISTING COMMUNICATION EQUIPMENT. ALTERATION OF 0 BOXES AND EQUIPMENT ON 1 TOWERS / STRUCTURES. LOCATION: TELECOMMUNICATION TOWER.

4241 W FULLERTON AVE, Chicago
Oct 7

LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 1. SPECIFIC LOCATION: FIXING VIOLATIONS.

1020 W 68TH ST, Chicago
Oct 7

WATER DAMAGE REPAIRS/REPLACEMENT ON ONE(1) 2500LB CAPACITY, 9-FLOOR, 100FPM, PASSENGER ELEVATOR(#74), PURSUANT TO THE SCOPE OF WORK SUBMITTED ON SITE AT TIME OF INSPECTION.(EV002615)

1725 W HARRISON ST, Chicago
Oct 7

FULL REBUILD (SAME AS EXISTING) FOR WOOD PORCH (OPEN) (QUANTITY: 1, LOCATION: FRONT OF BUILDING). LANDING: 35 SQUARE FEET. LANDING NOT MORE THAN 6 FEET ABOVE GROUND.

5760 S WELLS ST, Chicago
Oct 7

LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. SPECIFIC LOCATION: EMERGENCY ROOM.

836 W WELLINGTON AVE, Chicago
Oct 7

NEW INSTALLATION OF ONE(1) 3500LB CAPACITY, 5-FLOOR, 200FPM, PASSENGER ELEVATOR, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED.

2709 W TOUHY AVE, Chicago
Oct 7

DDS 2019 CBC: PILES (VERTICAL PENETRATIONS) ONLY PERMIT FOR A PROPOSED 5-STORY HOSPITAL BUILDING AS PER PLANS. (CONSTRUCTION TYPE: 1A; OCCUPANCY: I-2 INSTITUTIONAL) CONSULTANT REVIEWER: V3 COMPANIES OF IL

8000 S LAKE SHORE DR, Chicago
Oct 7

APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: MIXED USE. PROJECT AREA: 18.64 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S).

2696 S ASHLAND AVE, Chicago
Oct 7

INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 10.8 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF HOME. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817.

9800 S HARVARD AVE, Chicago
Oct 7

PROPOSED REAR BREEZEWAY CONNECTING GARAGE TO THE PRINCIPLE BUILDING, EAST SIDE GARAGE ADDITION, EXTERNAL ALTERATIONS, AND INTERIOR RENOVATIONS TO CONVERT EXISTING 3 STORY/2 UNIT RESIDENCE TO SFR, PER PLANS. VARIATION #517-25-Z TO DECREASE THE REAR AND SIDE SETBACKS APPROVED 01.21.2026.

352 W WISCONSIN ST, Chicago
Oct 7

NEW INSTALLATION OF ONE(1) 2100LB CAPACITY, 5-FLOOR, 150FPM, PASSENGER ELEVATOR, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED.

4403 N CHRISTIANA AVE, Chicago
Oct 7

DEMOLITION OF A 2-STORY RESIDENTIAL OCCUPANCY BUILDING. 2 RESIDENTIAL UNITS. 0 NON-RESIDENTIAL UNITS. INCLUDES DEMOLITION OF RESIDENTIAL PRIVATE GARAGE. LOCATION ON LOT: FRONT. (ORDINARY DEMOLITION.)

238 E 136TH ST, Chicago
Oct 7

SELF-CERT 2019 CBRC: REVISION TO PERMIT #101083534 TO INCLUDE REPLACING DRYWALL THROUGH THE ENTIRE UNIT, NEW ENTRY DOORS FOR THE UNIT, NEW GFCI OUTLETS IN THE KITCHENS AND BATHROOMS, NEW SMOKE & CARBON MONOXIDE DETECTORS THROUGHOUT THE ENTIRE UNIT AND REPLACEMENT OF THE EXISTING FURNACE AND WATER HEATER FOR AN EXISTING 4-STORY, TYPE IIIA MASONRY, 51' HT., 4-UNIT RESIDENTIAL BUILDING (OCCUPANCY GROUP R-2; TYPE IIIA CONSTRUCTION).

1528 N HUDSON AVE, Chicago
Oct 7

TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 1100 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: GARAGE.

1316 N ASTOR ST, Chicago
Oct 7

INSTALLATION OF (1) ONE EG PASSENGER ELEVATOR, 3500LBS CAPACITY @ 150FPM,, 3 FLOORS, SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS ELEVATOR BUREAU INSPECTION.

2644 N CENTRAL AVE, Chicago
Oct 7