Search Permits
180,504 results
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [1bed 1bath]
Install Level 2 EV Charger
stand alone tpole permit related to 2026-071791 EP
Express: Exterior siding/brick repair/replacement excess 128sq.ft. total roof replacement w/ WUI complaint metal roof window and door replacement size for size same locations
Homebuilders loop for New SFR ref 2026-075313 BP. Austin Full purpose
Interior Remodel and Garage Conversion- partial garage conversion for new bathroom and laundry reconfigure kitchen br dining create new bedroom.
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage covered front porch and covered rear patio.
Total demo of sfr 2055 sqft circa 1979
Install (1) UL listed DOLLAR TREE channel letter set on the North building elevation. Connect to existing electrical within 6 of the sign location.
Addition and Remodel The renovation of the entire existing house with two addtions at each end. A new workshop addition and the south end and a living dining kitchen and primary bedroom suite at the north end.
Sign 002 - New illuminated wall sign - North elevation
New pool
Unit B - New construction of Duplex condo each with 3 beds 2.5 baths and attached 2 car garages
Replacement of complete existing central heat and air system with or without duct work
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Main and sub panel change out
ePlan: Residential Expedited Review - NewAccessory to Primary [1bed 1bath].
Replace a gas line in the leasingoffice which is Building 11
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Express: Foundation repair
QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVA
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
Express: Replace HVAC system replace 240 sq.ft. of sheetrock in master bath and laundry closet
Emergency repair on an occupied home to replace main disconnect due to safety hazard.
New Construction Plumbing ETJ 2370 sq. ft.
New Single Family residence with 4 bed 2.5 bath and 2 car attached garage
New construction single-family residential 2-story 4 bedroom 2.5 bath with attached 2-car garage covered front porch and uncovered rear patio.
PROPOSED NEW ONE STORY 4969 SF CONVENIENCE STORE.
Express- Replacing 4 windows like for like in existing residential home
Tenant improvement of a ground floor build-out within an existing mixed-use building for a..