Search Permits
251,849 results
Subsequent filing for exterior plumbing work to install new sewer connection as per DEP approved documents.
Mechanical work filed in conjunction with apartment#6F renovation.
INTERIOR RENOVATION FILED TO CONVERT THE EXISTING COMMERCIAL SPACE TO AN EATING & DRINKING ESTABLISHMENT INCLUDING NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE TO THE USE, OCCUPANCY OR EGRESS.
Structural work in conjunction with commercial space renovation
Interior renovation of existing UG-6 Eating and Drinking Establishment. No change to use egress or occupancy.
Foundation work in conjunction with renovation of commercial space.
APPLICATION FILED FOR INTERIOR RENOVATION AT CELLAR, FIRST FLOOR, SECOND FLOOR AND ATTIC OF EXISTING (2) TWO-STORY WITH CELLAR, (1) ONE-FAMILY BUILDING. WORK INCLUDES REPLACEMENT OF WINDOWS AND RELATED INTERIOR RENOVATIONS.NO CHANGE IN USE, OR EGRESS.
NO CHANGE IN USE, EGRESS AND OR OCCUPANCY UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW PLUMBING FIXTURES AT TENANT SPACE.
Plumbing drawings filed herewith for alteration of existing church.
RECONFIGURATION AND RENOVATION OF 2 BATHROOMS. NO CHANGE TO OCCUPANCY USE OR EGRESS.
Proposed eating and drinking establishment within an approved commercial space, Use Group 6A, Occupancy Class B. No change to Use Group, Occupancy Class, nor Occupant Load.
HEREWITH FILING TO COMPLY WITH ECB# 39149959Z,39155416N AND EXTEND ADJACENT CHIMNEY FLUEVENTS WITH METAL LINER TO MEET WITH CODE 2022BC2113.1.5 and MC 801.1.1
General Construction Work as shown on plans submitted herewith. No change to use egress or occupancy as of right.
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 8E ON THE 8TH FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Address ECB violation# 34118627Z; 34167915Y; 34301931Z; 35305319R & DOB violation# 120397C07M02; 082001C07A05; 120194C07M09; 082618Z07CO04. Remove concrete parking pad, restore back to legal condition as per plan. No change in use, egress, or occupancy.
Relocating existing bathroom and kitchen fixtures. 2nd floor work only.
Filing for plumbing renovations as per plans filed. No change of use, egress or occupancy.
Filing to enlarge home and renovate the interior
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
PROPOSED HORIZONTAL EXTENSION AND INTERIOR RENOVATION. CONVERT FROM 1 TO 2 FAMILY DWELLING. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
HEREWITH FILING FOR INTERIOR MODIFICATIONS IN UNIT 17A AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Filing herewith general construction to include interior renovation to existing apartments 2N, 6CE, 7P, 14E and 14 DF as per plans
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
GAS CONNECTION FOR REPLACEMENT HVAC UNIT.
INSTALLATION OF NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Removal of ducts & piping with associated infrastructure as shown on plans. Work to include installation of condensate drain as shown.
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND RESTORATION.
Install Kitchen Hood, Exhaust Fan and Associated Ductwork as per plan. No Change to Use or Occupancy.
Filing herewith general construction scope for removal and installation of non-load bearing partitions and related finishes related to converting non-assembly accessory conference rooms to offices as per plans. No change in use, occupancy, or egress.