Search Permits
251,849 results
INFILL OF AN EXISTING ELEVATOR OPENING ON THE 8TH FLOOR FRAMING LEVEL AND ROOF ELEVATION FOR COMMERCIAL SPACE AS PER PLANS.
UNDERPINNING APPLICATION FILED IN CONJUNCTION WITH NB JOB NUMBER B00698051-I1.
FACADE REPAIRS, SCAFFOLD INSPECTIONS, 3 MEN LETTER.
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
PLUMBING WORK FOR ABSORBER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SOE AND FOUNDATION INVOLVED IN PARTIAL DEMO AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Installation of solar panels, rooftop, grid tied, railed, 29 modules, 11.89 KW
INSTALL NEW SPRAY BOOTH AND MIXING ROOM FOR EXISTING AUTO BODY SHOP, CONSTRUCTIONS WORKS AS PER PLAN, NO CHANGE ON EGRESS, USE OR OCCUPANCY.
Filing herewith general construction to include interior renovation to existing apartment 4N, 8A and 14B as per plans submitted.
REPLACE BOILER AND REINSTALL EXISTING GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
CONSTRUCTION OF TEMPORARY CONSTRUCTION SHANTY AS PER DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
RECONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND REINSTALLATION OF EXISTING GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
DIRECT REPLACEMENT OF ROOF TOP UNIT
Temporary mock-up construction in conjunction with application# M01383112-S5
Interior renovation as shown on plans filed herewith.
9005 - Interior renovation of existing Retail space for Kiehl's. No change in egress, use, or occupancy.
installation of a chain link fence with a precast jersey barrier.
INTERIOR RENOVATION OF EXISTING APARTMENT AT 2ND FLOOR ONLY. NO CHANGE IN USE, OCCUPANCY OR EGRESS
ERECT ONE-STORY ENLARGEMENT, ADD DORMER, AND REARRANGE PARTITIONS THROUGHOUT. CONVERT FROM TWO TO ONE FAMILY RESIDENCE.
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01272085-I1.
DIRECT TREPLACEMENT OF EXISTING KITCHEN SINK AND RESIDENTIAL COOKING EQUIPMENT WITH NEW FIXTURES INSTALLED AT THE SAME LOCATION. ALL EXISTING ROUGHING TO REMAIN. THIS APPLICATION SHALL SUPERSEDE ALL WORK DONE UNDER APPLICATION 101693437. NO CHANGE TO USE
MECHANICAL FILLING IN CONJUNCTION WITH ALT CO FILLING TO ENLARGE THE FIRST FLOOR AND ADD A NEW THIRD FLOOR TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 9TH, 27TH, 32ND, AND 41ST FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Removal of sprinkler fixtures and installation of temp loop on the 5th thru 10th floors as per plans. No change to use, egress or occupancy.
INSTALL NEW VENTING TO ROOF
PLUMBING WORK HAS BEEN FILED IN CONJUNCTION WITH JOB# M01266575-I1 AS PER PLAN SUBMITTED
RENOVATION OF EXISTING LAUNDROMAT. WORK INCLUDES NEW FLOORING, CEILING, PARTITIONS AND INSTALL LAUNDROMAT EQUIPEMENTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Installation of solar panels, rooftop, grid tied, railed, 9 modules, 3.915 KW