PermitDig

Search Permits

251,849 results

to obtain final inspection for work approved under pa# 202503182432. all work is complete.

280 Fair Oaks St, Mission
0KJul 6

to obtain final inspection for work approved under pa# 202503182434. all work is complete.

282 Fair Oaks St, Mission
0KJul 6

unit 501: convert e) closet to bedroom, rehabitate e) kitchen & bathroom, install wash/ dryer

2355 Leavenworth St, Russian Hill
69KJul 6

to obtain final inspection for work approved under pa# 201812208873 & 201902273969. all work is complete.

233 16th Av, Outer Richmond
0KJul 6

revision to bpa# 202512051105 includes a revised retaining wall associated structural details for removable umbrellas. wall repair at gridling 1 w/ associated strucutral detail.

201 Buena Vista East Av, Castro/Upper Market
0KJul 6

replace 58 windows in-kind. 18 at front, 35 between north nd south, and 5 on back. no change to openings. no structural. replace in kind

83 Fair Oaks St, Mission
70KJul 6

reduce 1st fl and add bike storage room accessible to garage. relocate laundry to interior closet adj to stair. add utility sink. voluntary lateral strenthening of garage and crawl space with sill plate epoxy anchor bolts. reinforce crack in foundation at north side of crawl space.

871 Corbett Av, Twin Peaks
35KJul 6

revision 202401043396- add (n) beam and post @music room ceiling.

201 Buena Vista East Av, Castro/Upper Market
0KJul 6

rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights.

341 Park St, Bernal Heights
600KJul 6

unit 207: install one new clothes washer and dryer. replace kitchen countertop and cabinets in kind. no structural work.

2171 Pacific Av, Pacific Heights
15KJul 6

soil stabilization with permeation grouting at edge of foundation footing. fssi soil stabilization plans job number 5740-26 dated 6/10/26. korbacher statement of planned operations dated 6/22/26

1439 22nd Av, Sunset/Parkside
6KJul 6

kitchen remodel, cabinets, new sink, tiles all in kind, replace 4 windows non street facing, back of bldg.

120 Fernwood Dr, West of Twin Peaks
24KJul 6

1/f: add 1 full bath, 1 half bath, 1 bedroom and 1 family room (710 sf). 2/f: kitchen relocate, add half bath. 3/f: add master bathroom. new radiant heat, replace windows, repair (e) deck less than 50%.

1357 17th Av, Inner Sunset
245KJul 6

replace stucco wall in kind left side of house, non street facing. replace rotted wood on deck, front of house. less than 50%

495 Lakeshore Dr, Sunset/Parkside
25KJul 6

deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and ramps

2545 16th St, Mission
0KJul 6

renovation of sfd. minimum horizontal addition @ rear. add decks @ several levels @ rear. reconfigure facade @ rear by modifying windows, doors & finishes. replace windows throughout in-kind or similar. new rear yard terrace & equip vault, update shoring for pool under pa# 202508263945.

2760 Vallejo St, Pacific Heights
300KJul 6

shoring and underpinning at demolished exterior stairs to make ready site for future build back under bpa 202602105607. stair demo under bpa 202605181443.

655 Brotherhood Wy, Lakeshore
104KJul 6

revision 202411084696: loft level: demo as req for new walls, windows, finishes,fixtures and flooring per new interior layout. main level, demo as req for new finishes at e walls receiving new shearwall sheathing. gr lvl: demo as req for foundation underpinning/repair,walls for new shearwalls

167 20th Av, Outer Richmond
124KJul 6

replacing existing amplifier in emergency responder radio coverage system. reference permit# 201705197142

218 Buchanan St, Hayes Valley
60KJul 6

mods to (e) fire alram life safety system as required by bldg elevator upgrades & removal of sprinkler heads from elevator control rooms. lvl b2,10,11,22 & roof lvl where elevator mech/control rooms are located. only heat detectoors for low, mid & high rise elevator will be removed after upgrades

560 Mission St, Financial District/South Beach
30KJul 6

to comply with nov# 202308178.existing work to be permitted is an air conditioning/heat pump unit on bathroom roof at north side of building.

515 Webster St, Hayes Valley
2KJul 6

construct a deck and spa structure within the rear yard of an existing single-family residence. the new deck will be less than 3'-0" above grade and flush with the raised spa structure. the proposed includes a 6'-0' tall lattice fence along the rear and side property lines for privacy.

2050 Jackson St, Pacific Heights
200KJul 6

Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.

125 EAST 12 STREET, Manhattan
Jul 5

Alterations

1101 WASHINGTON AVE, Philadelphia
Jul 5

Alterations

303 LEVERINGTON AVE, Philadelphia
Jul 5

New Construction

2513 FEDERAL ST, Philadelphia
Jul 5

Addition and/or Alteration

5238-50 LANCASTER AVE, Philadelphia
Jul 5

Alterations

13430 WORTHINGTON RD, Philadelphia
Jul 5

Addition and/or Alteration

5439 WALNUT ST, Philadelphia
Jul 5

EZ Interior Non-Load-Bearing Wall Demo.

869 N STILLMAN ST, Philadelphia
Jul 5