Search Permits
251,849 results
PROPOSED 8' CONSTRUCTION PLYWOOD FENCE
RENOVATION OF INTERIOR SPACE ON THE FLOOR, INCLUDING THE INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Structural work including concrete repair.
HEREBY FILING NEW FOUR (4) STORY + MEZZANINE SEVEN CLASS 'A' UNITS
SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS
HEREWITH FILING APPLICATION TO ERECT CONSTRUCTION FENCE
Installation of new plumbing fixtures on new roughing. No change in use, occupancy or egress.
Renovate 1st floor of existing 2 family house. Install new flooring, kitchen cabinetry, and replace existing rear facade window/door with new sliding glass doors.
Temporary Shoring of building from Cellar to Roof prior to to carrying out required Partial Demolition Work.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER
PROPOSED AMENDMENT OF CO FOR A SENIOR ADULT CENTER ON THE FOURTH FLOOR AS PER PLAN. CHANGE IN USE AND OCCUPANCY,OBTAIN A NEW CO.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
NEW DECK AND STAIRS AT REAR YARD. NEW DOOR AT FORMER WINDOW OPENING. RE-OPEN FORMER WINDOW OPENING AND INSTALL NEW WINDOW.
Removal and installation of interior non bearing partitions and related finishes as per plans filed for 41st floor.
Structural alterations at roof level: new steel dunnage framing for mechanical equipment, reinforcement of existing beam connections, new/infilled roof slab openings, HSS posts w/ epoxy anchors. No change in egress, occupancy or use.
Mechanical work as shown on plans filed herewith.
Propose installation of three (3) ADA restrooms and modification & relocation of existing five (5) sprinkler heads & one (1) sprinkler head removal. No change in use, egress or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 42 modules, 17.22 KW
plumbing modification associated with apartment renovation
Replacing HVAC unit on roof with new as per plans filed herewith.
TO PROPOSE INTERIOR RENOVATION IN UNIT #3F WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
HEREWITH FILING FOR THE REPLACEMENT OF DROP CEILING ON SAME LOCATION AND PATCHING AND REPAIRING INTERIOR WALLS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Install new shower, boilers & water heaters at cellar, in conjuction with alt2 application, no change in use, egress or occupancy.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLMENT OF TWO YORK CHILLERS IN SUB-CELLAR 1, SUB-CELLAR 2 AND TWO SPLIT DAIKIN UNITS ON MAIN ROOF, NO CHANGE IN EGRESS OR OCCUPANCY.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 24TH AND 25tH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL EXTERIOR ILLUMINATED WALL SIGN (HOLD UP ROLL UP)
Installation of solar panels, rooftop, grid tied, railed, 27 modules, 11.745 KW
Propose installation of three (3) ADA restrooms and modification & relocation of existing five (5) sprinkler heads & one (1) sprinkler head removal. No change in use, egress or occupancy.