SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE RESIDENTIAL CONVERSION FILED UNDER GC #M01283781-I1
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Interior renovation with installation of new partitions, doors, ceilings and finishes on the 8th floor (Avoro Capital) as per plans. No change to use, egress or occupancy.
General Construction for interior renovation of Apartment 7G on the 8th floor as shown on drawings filed herewith. No change in use, egress, or occupancy.
This Plumbing Application is a Subsequent Filing. The work, including costs, were included in the scope of Initial Project Filing. This is to clarify that the 3 fixtures in the new bathroom are identified as plumbing work.
Interior alteration as per plans. No change in use, egress or occupancy.
ALTERATION (TYPE 2) OF AN EXISTING SINGLE-FAMILY TOWNHOUSE. WORK TO INCLUDE 3RD FLOOR BATHROOM, INTERIOR PARTITION WORK, PLUMBING, AND ELECTRICAL. ROOF PAVER, CABINETRY, PLUMBING, GAS, AND ELECTRICAL.
ALT-CO FILING TO PROPOSE HORIZONTAL ENLARGEMENT OF EXISTING ONE FAMILY DWELLING AT 1ST & 2ND FLOORS. PROPOSED NEW ATTIC
Proposed interior renovation of Apt #8901, includes the removal of ex. partition walls, removal of pocket doors in the Living room. Installation of new partition wall at the existing pocket door location. Install new ceiling with integrated lighting fixt
Installation of solar panels, rooftop, grid tied, railed, 13 modules, 5.72 KW
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ERECT 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE ALONG LOT 03 IN CONJUNCTION WITH DEMOLITION
FN/Francis Lewis HS - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB # 421104067 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Installation of solar panels, rooftop, grid tied, railed, 13 modules, 5.33 KW
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
ALT-2 FILING FOR SELECTIVE NON-STRUCT WORK: LIMITED REMOVAL OF EAST FRONT/REAR FACADE AT 5TH-7TH LEVELS AND 250 SF ROOF TO RESTORE FACADE & ELEVATOR BH. NO CHANGE TO ZONING, BULK, HEIGHT OR FLOOR AREA.
STRUCTURAL WORK INCLUSIVE OF FRAMING, METAL STEEL DECK, REMOVAL OF EXISTING CONVENIENCE STAIRS AND SLAB OVER ALONG WITH REINFORCING BEAM WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of solar panels, rooftop, grid tied, railed, 8 modules, 3.28 KW
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #X01414345-I1
Plumbing works for New Building Filing.
INSTALLATION OF TEMPORARY WOOD CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Installation of solar panels, rooftop, grid tied, railed, 19 modules, 7.79 KW
Installation of solar panels, rooftop, grid tied, railed, 19 modules, 7.79 KW
Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.
SUBSEQUENT APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 5TH FLOOR (SUITE 500) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS, OR OCCUPANCY.
REPAIR/REPLACE THE EXISTING CRACK CEMENT COATING=500 SF
Modifications to mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
Mechanical plans for new 1 family residential house