Search Permits
251,795 results
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation and use of temporary contractors shed/shanty as per plans filed herewith. This application is filed in conjunction with with NB X00851840-I1.
INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 7,000 LB DUAL PERSONNEL HOIST CARS AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AND SHORING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CUSTOM COLOR SPLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN. NO CHANGE IN USE, OCCUPANCY & EGRESS.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
INSTALL EXTERIOR ILLUMINATED WALL SIGN (SOCCERIA)
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Mechanical work as shown on plans filed herewith.
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - VERIZON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MANHATTAN MINI STORAGE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 29th and 30th floors (Day 2 TradeWeb) as per plans. No change to use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
TO PROPOSE INTERIOR RENOVATION OF AN EXISTING STORE AND TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS, EXHAUST DUCTWORK, AND EXHAUST FAN AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
Demo supply and return ductwork, air devices and heating/cooling devices on 41st floor.
FACADE RESTORATION PHASE 2 A AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
GENERAL CONSTRUCTION AND STRUCTURAL WORK CONSISTING OF INSTALLATION OF NEW WALKWAY AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.