6th fl - ref pa 202502266563/202605221763 electrical only power & signal/lighting
solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install 15 kwh franklin ess and tie in existing pv
to obtain final inspection for work approved under pa#2020008061273 & 202109087989 all work is complete.
17/f, ste 1700: deferred electrical for pa# 202604028794- provide new lighting and branch circuiting. new power and signal branch. title 24.
25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panel
t.i to (e) retail consisting of replacing three (3) condensing units that have reached end of life. new equipment will be of similar height and weight to (e) equipment to be replaced. all work work will occur overnight to avoid store operation being disrupted.
5floor; t.i. demo of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. bldg is fully sprinkled.
alteration to front and rear facade. change of use from existing print shop to contractor's office. provide an accessible restroom per cbc 11b-202.4.
add/relocate (7) fire sprinker heads
remove lather and plaster in all bedrooms and hallways, install new sheetrock and insulation, kitchen and bathroom remodels,, plumbing and electrical, dining room ceiling install new insullation and sheetrock.exterior walls to be upgreded with min
replace water heater to tankless. replace insulation in the attic. add (1) new gfci outlet in the garage.
interior remodel to units 248, 250a, 250b, 252a & 252b. unit 248: remodel kit, convert living rm to bedrm, add 1-bath & home office; unit 250b: kit & bath remodel; unit 250a & 252a: relocate kit, add laundry, convert kit to office; unit 252b: relocate kit & laundry, remodel bath
remodel of (e) bathrooms on 1st and 2nd floors.
to obtain final inspection for work approved under pa# 2024-0814-8603. all work is complete
structrual revision to pa# 202508193387, upon field verification, to perform voluntary structural strengthing to foundation and framing according to revised plans. no exterior or interior architectural changes. add additional plywood sheathed wall in garage.
1)expand the rear portion of the garage to create a new storage, trash area & bicycle parking. new retaining walls. add new stair connecting the garage to the crawl space. nfpa-13r fire sprinklers for new spaces shown on this permit application will be provided under a deferred permit.
kitchen remodel like for like.
10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittal
to obtain final inspection for work approved under pa#'s 202410283848 and 202501228779. all work is complete.
to obtain final inspection for work approved under pa#'s 202412187056 and 202502059739. all work is complete.
renovation of a prior existing cafe space limited to interior upgrade of finishes including tile, cabinets, counters and new appliances.
new porch and stair to yard, kitchen remodel, remodel existing bathroom main level and add bathroom at main level.replace 7 windows.
floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.
construct play structure footings which is a deferred submittal item under pa#2024-0920-1259. play structure under separate submittal.
to obtain final inspection for work approved under pa# 202406114238. all work is complete.
proposed temporary shoring
exterior stair repair, <50%, replace with new wood in kind. not visible from the street.
exterior stair repair, <50%, replace with new wood in kind. not visible from the street.
selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.
rev to pa# 2026-0421-9807: alteratin includes demo of 2 cofference rooms and existing millwork and construction of a prep room, janitor closet, and new millwork for break room and coffee station