Search Permits
179,898 results
Sign 002 - New illuminated wall sign - North elevation
New pool
Unit B - New construction of Duplex condo each with 3 beds 2.5 baths and attached 2 car garages
Replacement of complete existing central heat and air system with or without duct work
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Main and sub panel change out
ePlan: Residential Expedited Review - NewAccessory to Primary [1bed 1bath].
Replace a gas line in the leasingoffice which is Building 11
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. Replace existing lighting fixtures switches and outlets as needed. No new circuits service change.
Express: Foundation repair
QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection Aux EP needed. Remodel EP not needed. Existing multi family - OVA
CHANGE OF USE MED OFFICE TO PERSONAL USE FITNESS Finish for Fitness Studio in prior demod space
Express: Replace HVAC system replace 240 sq.ft. of sheetrock in master bath and laundry closet
Emergency repair on an occupied home to replace main disconnect due to safety hazard.
New Construction Plumbing ETJ 2370 sq. ft.
New Single Family residence with 4 bed 2.5 bath and 2 car attached garage
New construction single-family residential 2-story 4 bedroom 2.5 bath with attached 2-car garage covered front porch and uncovered rear patio.
PROPOSED NEW ONE STORY 4969 SF CONVENIENCE STORE.
Express- Replacing 4 windows like for like in existing residential home
Tenant improvement of a ground floor build-out within an existing mixed-use building for a..
ePlan Review: New Construction Mechanical Equipment Yard. This scope was previously under 2025-116801 BP and 2025-116801 EP. AE requires that it be split off due to addressing issues with electrical meters on site.
Install irrigation system
sewer repair in slab. breaking 12ft of slab for suite 110
PB- New Construction 2 story SFR 3bed 2.5bath with attached garage and covered patio/porch
*Type 2 RESIDENTIAL AFFORDABLE HOUSING DEVELOPMENT BONUS PROGRAM* ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [2bed 1.5bath]. Bldg 2
Repairs were made by replacing the lugs at the meter base and the main disconnect was replaced; this was an emergency call because the apartment is occupied.
Install EV charger for customer
Excavate 10 tunnel to repair the main drain line under the house
driveway_permit_(r)
re-roof_(r)