Search Permits
251,795 results
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).
revision to pa# 202606294094: units 1, 3 & 4: remove areas marked by restoration company to allow area to dry. replace with new drywalll; patch and paint. to comply with nov 202657120 #2 and nov 20657028 #6.
to obtain final inspection for work approved under pa# 202503101889. all work is complete.
revision to 202605231820 for in kind no plans. new application shows relocated bathroomo fixtures and 1 removed non bearing wall.
to obtain final inspection for work approved under pa# 202503273143. all work is complete.
building
mechanical
plumbing
plumbing
plumbing
mechanical
electrical
electrical
plumbing
electrical
electrical
electrical
fire_protection
plumbing
building
electrical
building
plumbing
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 18TH FLOOR CONSTRUCTION (19TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF DEBRIS CHUTE AT 40 HAVEN AVENUE, MANHATTAN NY 10032 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING BLDG DEMOLITION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.