Search Permits
251,795 results
HEREWITH FILING FOR THE ENLARGEMENT OF THE SECOND FLOOR OF AN EXISTING TWO-FAMILY DWELLING AND FOR THE RESOLUTION OF OPEN ECB VIOLATION(S). NO OTHER WORK PROPOSED UNDER THIS APPLICATION.
INSTALLING TEMPORARY CONSTRUCTION FENCE IN FRONT OF PROPERTY FOR SITE SAFETY
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of suspended scaffold for facade work or inspection.
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 1st floor (Insta 360) as per plans. No change to use, egress or occupancy.
CONSTRUCTION FENCE - APPLICABLE TO NEW BUILDING APPLICATION AND DEMO APPLICATION
MINOR INTERIOR RENOVATION OF (2)FAMILY HOUSE. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
RENOVATION AT THIRD FLOOR OF EXISTING 2 FAMILY HOUSE, INCLUDING MINOR REMOVAL OF NON LOAD BEARING PARTITIONS & REPAIR OF FLOORING. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
INSTALL (2) NEW CHIMNEY EXTENSIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
INTERIOR RENOVATION OF 4TH FLOOR EXAM ROOM AS PER PLANS. NO CHANGE TO USE, EGRESS OROCCUPANCY.
MODIFICATIONS TO EXISTING SPRINKLER AND STANDPIPE SYSTEMS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Interior alterations to fire damaged two-family dwelling as shown on submitted plans. No change in occupancy, use or egress.
Modifications to plumbing / sprinkler system for interior demo, install TCSP on 26 & 27th floor
Installation of solar panels, rooftop, grid tied, railed, 12 modules, 4.92 KW
General Construction buildout to existing 8th floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
PROPOSED PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION # X01266815-I1
Minor partition work with general carpentry t 2H . No change to use , bulk or egress
Propose to remove and install nonbearing partition and wood deck all as per plans filed herewith. No change in use egress or occupancy is proposed under this application
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work or inspection.
exterior renovation of exist. two family building work on OSP with install new awning , no change in use, egress or occupancy.
INSTALL TEMPORARY 8'H CONSTRUCTION FENCE IN CONJUNCTION WITH DOB# B01347922-I1.
PARTIAL RENOVATION OF AN EX. MIXED-USE BUILDING WITH INTERIOR PARTITION AND PLUMBING WORK TO REPAIR FIRE DAMAGE. SCOPE ALSO INCLUDES REPLACEMENT OF WINDOWS. PLUMBING UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Solomon Group to erect a temporary structure (FIFA Booth #1319) within an existing exhibition building for FANATICS FEST 2026. Scheduled construction to begin on 07/09 and end on 07/20. No change in use, egress or occupancy.
Sprinkler head & Temp Loop changes as indicated on plans.
Removal of interior partitions to create one large loft like dwelling, one 3 piece bathroom and kitchen to remain. No change to occupancy, use or egress.
Modifications to the existing plumbing system on the 3rd and 4th floors (Piper Sandler) as per plans. No change to use, egress or occupancy.
SCOPE OF WORK INCLUDES THE DEMOLITION AND CONSTRUCTION OF A NEW STOREFRONT SYSTEM AND MINOR REPAIRS AND REFINISHING OF EXISTING FACADE ELEMENTS. NO CHANGE TO USE, OCCUPANCY OR EGRESS