Search Permits
251,795 results
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Erection of temporary mock-up structures on roof to determine the visibility from public thoroughfares of proposed additions and mock up of applied trim to window at front facade.
APPLICATION IS FILED FOR THE DEVELOPMENT OF ATTACHED 2-FAMILY, 3-STORY RESIDENTIAL BUILDING WIITH ONE-CAR GARAGE ON ZONING LOT WHICH CONSISTS OF (3) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
Interior demo and build out of partitions, ceilings and doors. No change in use, egress or occupancy.
RENOVATION OF EXISTING APARTMENT AS PER PLANS HEREWITH FILED.
Installation of temporary fence in conjunction with X01015627
INSTALL FENCE IN CONJUNCTION Q01288558. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Relocate the 1st floor exit door as per plans. All work as per plans filed herewith only.
RENOVATE EXISTING COMMERCIAL SPACE TO BE GROCERY STORE. COSMETIC WORK AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - LE CAFE COFFEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Construction work on the 25th floor as indicated on drawings.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 404 EAST 63 STREET MANHATTAN NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
PROPOSE ACCESSORY AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
INTERIOR DEMOLITION ON EXISTING 4-FAMILY,THREE(3) STORY BRICK RESIDENTIAL BUILDING WITH BASEMENT.NO CHANGE OF BUILDING BULK,OCCUPANCY OR EGRESS.
PROPOSED TEMPORARY 8' HIGH CONSTRUCTION FENCE
INTERIOR ALTERATION OF AN EXISTING COMMERCIAL SPACE. WORK INCLUDES NEW INTERIOR PARTITIONS, CEILINGS, FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Mechanical work as shown on plans in conjunction with GC work type.
Structural changes on the 8th and 9th floors as indicated on drawings.
Modification to existing mechanical system related to apartment renovation.
WORK TO INCLUDE NEW PARTITIONS, ACOUSTIC CEILINGS, MATERIALS, FIXTURES, FINISHES & EQUIPMENT THROUGHOUT. WORK ON 2ND FLOOR INTERIORS ONLY.
EXISTING LAUNDROMAT INTERIOR RENOVATION. REPLACE WASHING MACHINE AND INSTALLATION OF HVAC SPLIT SYSTEM UNITS.NO CHANGE TO USE EGRESS OR OCCUPAN
FILE THE SPRINKLER WORK TYPE INVOLVED INSTALL 2 1/2 DRAIN AT 80 AFF. AND RELOCATE ONE EXISTING SPRINKLER FHV. AT 3RD FLOOR. SPRINKLER WORK AS PER PLAN FILED HEREWITH