Search Permits
251,795 results
deck rebuild like for like less than 50%. front and rear windows waterproofing like for like. front entry arch like for like. full property paint. work in common areas.
add (4) massage rooms to the shop at ground floor. remodel the front door entrances. change of use from retail to massage
14/f: mechanical for pa# 202605201633 provide new mains and lowside ductwork per new architectural layout. provide new transfer for serving server room. provide new water source heat pump serving board room.
suite 430: deferred mep for 202604300443
remodel of (e) radiology & podiatry spaces on the 3rd flr @ 2238 geary bldg.kaiser sf. scope of work include architectural, strucral, mechnical,plumbing & electrical modifications to provide imaging rooms,exam rooms,offices,dressing rooms & a staff toilert. project to be completed in (4) separate...
to obtain final inspection for work approved under pa#201604185041& 202106212879. all work is complete.
re-paint north and south brick facades in kind. apply helical anchors and tie-in system to increase structural integrity. work is not visible from the street.
Construct an eco-block retaining wall accessory to a single-family residence per plans
zoning
zoning
building
electrical
electrical
electrical
electrical
mechanical
building
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FAADE REPAIRS PER DRAWINGS ATTACHED HEREWITH.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
FILING HEREWITH FOR SOIL IMPROVEMENTS INCLUDING SOIL MIXING AS PER PLANS. FILED UNDER MPP Project-000000254.
Temporary construction fence in conjunction with DOB NOW job # B01111094-I1
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.