Search Permits
251,795 results
INSTALLATION OV PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
Removal and installation of non bearing partitions and related material finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
INSTALLATION OF PLUMBING FIXTURES FILED IN CONJUCTION WITH THE FOLLOWING ALT 1 APPLICATION #M01415287, M01367497, M01367505. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
STRUCTURAL WORK ON THE 1ST FLOOR, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
This filing is specifically for the panels being installed on the second structure on this property.
Construct drainage outfall improvements for Lakeridge Park per plan.
Construct addition to west side of existing one-family dwelling subject to field inspection STFI
Allow housing for one new detached dwelling unit per land use code. Existing detached dwelling to remain. Construct new one-family dwelling with attached garage per plan. New concrete driveway.
Demolish single story commercial building per plan.
Establish as vacant per the land use code. Demolish residential structure per plans
Construct east townhouse building per plan. (Establish use as a new 5 unit townhouse per land use code. Construct two new townhouse buildings per plan. Review and processing for two records under 6853386)
Construct interior alterations to upper level of one family dwelling subject to field inspection STFI.
Reroof of Both Steep Slope and low slope areas:1. Steep Slope; remove and replace in like kind asphalt shingle roofing. Remove existing asphalt shingle roofing and dispose of properly. Install New Certainteed Landmark Asphalt shingle roofing system underlayment new edge metal and flashing all per manufacturer requirements for install. 2. Low Slope: remove and replace in like kind. Remove existing single ply roofing dispose of properly install new Carlisle 60mil TPO Single Ply membrane r
Emergency slope stabilization: Construct site retaining walls including piles and tiebacks to stabilize steep slopes on site for one-family dwelling per plan.
Demolish one-family dwelling per plan.
Establish use as vacant land per land use code. Demolish existing commercial building per plan.
Addition and alterations to a single-family dwelling unit subject to field inspection.
Demolish single story commercial building (Hardwick's Swap Shop) per plan.
Allow new detached accessory dwelling unit to existing single family use per land use code. Construct new one-family dwelling per plan. Remove existing accessory structure.
Reroof: Recover of existing asphalt bur roof roof with a Carlisle 60mil TPO single ply roofing system. Includes new edge metal and new flashings at penetrations all details per manufacturer recommendation's for install and for a 20 yr warrantable system.
Construct alterations to one family dwelling subject to field inspection STFI.
bathroom remodel, like for like. no layout change. approximately 40sf
remove section of defective brick wall in front yard. wall height is 24-30 inches. prep the dirt for mulch and gardening. less than 10cy.
revision to 202106283357 to modify mudroom walls and add beam
to obtain final inspection for work approved under pa # 202010287614, 202207219037, and 202211186867. all work is complete.
remove existing radiant floor heating system and install mini split condensor and 2 heads. condenser located in rear yard, service heads located in living room (lower floor) and bedroom area (upper floor).
to obtain final inspection for work approved under pa# 202305308799. all work is complete.
dry kings restoration has performed emergency sevices to restore and stabalize building after fire removal of non salvagable materials drywall, insulation, carpets, fie contents.