Search Permits
251,795 results
INSTALLATION OF PLACING BOOM. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGREES.
INSTALLATION OF HEAVY DUTY SIDE WALK SHED.AS PER PLAN.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILE MECHANICAL IN CONJUNCTION WITH JOB #: B01288161-I1.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
TEMPORARY CONSTRUCTION FENCE
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of solar panels, rooftop, grid tied, railed, 44 modules, 18.04 KW
INSTALLATION OF NEW SPLIT SYSTEM AIR COOLED HVAC UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Replacement of existing condensing units with new mounting on roof. Replacement of existing air handling units in existing equipment room on 3rd floor. Related lineset. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
SUBSEQUENT FENCE APPLICATION IN COJUNCTION WITH APPROVED GC #B01226460-I1
Removal of existing units and associated piping and ductwork on the 31st floor as per plans. No change to use, egress or occupancy.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
RENOVATION OF PROPOSED LAUNDROMAT ESTABLISHMENT WITH, REPAIR/NEW PARTITION, FLOOR, CEILING, DOOR, PAINTING, ALSO INSTALL DRYER EXHAUST AND SPLIT TYPE A/C AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to the existing sprinkler system on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy.
GAS PIPING WORK IN RELATION TO INSTALLATION OF (9)UNIT HEATERS ON THE CEILING @ 1ST FLOOR. NO CHANGE OF OCCUPANCY AND EGRESS.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
partial renovation of an existing commercial space with no changes to use, egress, or occupancy.
CONSTRUCTION FENCE FILED HEREWITH
Hereby filing to install new mechanical units with associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of solar panels, rooftop, grid tied, railed, 21 modules, 9.24 KW
Modifications to the existing HVAC system on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy.
STRUCTURAL REPAIRS TO EXISTING FLOOR SLAB IN APARTMENT 9C ON THE 9TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.