Search Permits
18,232 results · type: plumbing
ETJ - New Construction of Tiny Home Master Water Tap: 2024-135380 W
Installing a new irrigation system
Replace underfloor cast iron waste and vent piping with new PVC piping. We will break concrete in the garage(20) tunnel (20) to the washer and bathrooms break across the driveway(25) and run to the city cleanout across the grass(40). On the left side of the house at the kitchen sink we will tie on to the piping in the wall run down to below grade outside and run across the grass and connect to our new line from the garage(Right side of house)
Construction of a two level storage facility in Building C at the Domain Shopping Center including a 582 SF ground level and 3959 SF upper level installation of an elevator and new finishes MEP systems electrical and equipment. 2026-057872 DA
7 DAY - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing CUP remove the indoor domestic water storage tank and install a new domestic water storage tank on new concrete pad outside of the CUP - OVA
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
PLUMBING PERMIT FOR GUEST BATH. TUB TO TUB REPLACEMENT WITH 60 X 30 RIGHT DRAIN TUB. NO DRAIN RELOCATION, NO STRUCTURAL CHANGES. WALL SYSTEM TO 84-IN CEILING HEIGHT. FLOORING BASEBOARD REPLACEMENT INCLUDED. VANITY COUNTERTOP REPLACEMENT WITH SINK AND FAUCET. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
PLUMBING PERMIT TO REPLACE TUB TO SHOWER. REPLACING PAN, DRAIN, AND VALVES. USING GLASS DOOR. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
plumbing
plumbing
INSTALLATION OF NEW PLUMBING FIXTURES AND MODIFICATION OF SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILED HEREWITH FOR PLUMBING WORK TYPE FOR EXISTING GONGCHA REMODEL. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
PLUMBING WORK TYPE HAS BEEN FILED IN CONJUNCTION WITH CONSTRUCTION #Q01250828-I1 AS PER PLANS SUBMITTED.