Search Permits
14,651 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work Replace existing 3-ton vertical gas split HVAC system
Replacement of complete existing central heat and air system with or without duct work INSTALL NOTES: Replace 3 ton gas system. Upflow on the first floor. The existing system will be removed earlier.
Addition and remodel of existing 2-story single family residence: Addition on second floor above garage includes a guest room office room bathroom and uncovered roof deck. Addition is accessed via a new second stairway and it is walled off from the existing portion of the second floor. Both the new and existing stairway are accessed nearby from the same hallway on the first floor. On the existing first floor a remodel and porch enclosure will include the new stairway and a hallway between th
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath] with Covered Porch and Covered Patio. 1003 LINCOLN ST
Replacement of complete existing central heat and air system with or without duct work
*Secondary contractor Install new walk-in cooler with 13 glass doors. Installation for cooler box and refrigeration core
Unit 2201 3 story 3 bedroom 3 bathroom townhome building using the 5-Plex C prototype is plan 1499R
Bldg 1 (8905 Georgian Dr) New construction of 2-Story Single Family Res. [3bed 3.5bath] with Attached Garage
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Refresh like and kind for interior finishes drywall ceiling grid lighting paint HVAC and cabinetry following asbestos abatement. Adding 1 interior wall & door to create pantry. Adding 2 electrical outlets in the building for existing AFD Fire Station.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3bath] with Office Covered Porch and Attached Carport. 1001 LINCOLN ST
Replacement of complete existing central heat and air system with or without duct work replacing like for like 3t vert gas
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replace existing 4-ton HVAC system including Lennox gas furnace AC condenser indoor coil and associated components. No structural changes.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Unit 2203 3 story 3 bedroom 3 bathroom townhome building using the 5-Plex C prototype is plan 1499R
MEP Systems Upgrade and Expansion along with replacement of existing server racks and associated equipment.
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration: Replace existing 2.5-ton split heat-pump system
ePlan: Commercial Expedited Review - Addition to Existing Office Building. Work to include 1000 SF New Shell Building and New Wood Deck and Trellis (3423 SF).
Replacement of complete existing central heat and air system with or without duct work replacing like for like 3t horz gas