Search Permits
251,795 results
to obtain final inspection for work approved under pa 202002285763 & 202306069386 all work is complete
revision to bpa: 202212168554 - replacing, previous a1, sheet bpa:202509024416. relocate previously approved skylight (not yet framed) to a centered location within the same bedroom. revise 2 interuir doors to one double french door and relocate hallway door.
tenant to remove & reconstruct (e) stair, renovate (e) restroom/adjoining wall. provide new window, drinkling fountain, mop sink & kitchenette. change of use to office.
2nd/f unit: remodel/relocate e) kitchen & dinning, new common bathroom, remodel e) bath & new laundry. no exterior work
repair and replace stairs tiles less than 50% repair. replace broken garage door with like to like garage door. work is street facing front of home.
remodel (e) full bath and add 1 full bath, close doorway between family and living room.
deferred submittal for pa#: 202512121719 for review of climbing walls.
stair railing replacement. like for like.
bathroom remodel in kind. no change to floor layout. no change to wall layout. no structural work.
deferred electrical for pa# 202512010636
rev 202603127448: new deck at rear (8x20ft) & minor arch layout changes.
resurface (e) concrete slab inside building.
to obtain final inspection for work approved under pa# 201912200237. all work is complete.
to obtain final inspection for work approved under pa# 201811155981. all work is complete.
replace finished in existing guest bathroom and water closet like for like repairs.
2/f: remodel (e) kitchen & (e) bathroom. 1/f: new bedroom, media room, bathroom, wetbar, relocate laundry and mech.
revision to #202603167679. material change to wall assembly located in exterior breezeway. replace gympsum with lp fireblock osb to provide fire protection for exterior application.
1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no exterior work
remodel kitchen and six bathrooms, in kind. update electrical and plumbing. kitchen-268 sq ft, bath #1-64 sq ft, bath #2-77 sq ft, powder bath-52 sq ft, master bath-224 sq ft, bath #3-41 sq ft. bath #485 sq ft. minor removal of drywall/plaster, patch and repair as required.
revision to 202106162598 structural configuration & detail (recommencement under 202410072455) removal e) front stairs & replace with new stairs, correct nov 202657629 & 202312753
increase entry lvl height by raising ground lvl wall by 1'-0"; convert entry lvl suite to 2nd dwelling unit; replace (e) window @ entry lvl w/ roll up door to accomodate off street parking; horizontal addition in the rear yard; setback vertical addition above (e) 2nd lvl.
replace rear retaining wallk and concrete steps
to obtain final inspection for work approved under pa # 202108136444. all work is complete.
foundation partial improvements - voluntary. seismic partial shearwalls improvements.
remove approximately 200 sq ft of stucco at stair wall and lower windows. repair damged plywood and re-stucco to match existing . repair dry rot.
change of occupancy/use from (e) s-2 warehouse to establish planning code use of light manufacturing(private fleet maintenance facility s1).proposed site improvements include stripping of standard on-site parking stalls.location of future lifts,under a separate permit identified.no plumbing fixtures
revision to approved pa# 202603197965: reconfigure rooms layout at ground floor. reconfigure (e) bathroom at 2nd floor. remodel (e) bathroom at 3rd fl. remove (e) posts & beam at ground fl & replace w/ walls & foundation. replace (e) windows/skylights per plan.
remodel 2 bathrooms in kind. no changes to layout and size.
to obtain final inspection for work approved under pa#202308033726. all work is complete.
1 kitchen remodel on the 3/f, 3 bathroom remodel on the 4/f. no walls removed.