Search Permits
251,795 results
to obtain final inspection for work approved under pa#201010283960, all work is complete.
recommencement and completion of work approved under pa #202206065659
recommencement and completion of work approved under pa# 2023-0830-5614 and pa# 2024-0723-7073
shoring for addition foundation, ref bpa#202512182208
provide missing errcs per app# 201408053094 s5 r1 and 201408053094 s6.
construction of a new floor subdrainage system and sump pump. the work is limited to the rear of the building. excavation of 12" wide french drain trenches and placing drain pipes. the drains will lead to a larger sump basin w/ a sump pump,which will connect to the house sewer lateral.
replace interior bearing wall in garage with new steel beam
demolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per sfbc ab-017 accessible compliance documentation will be provided wit ti appliction under separate permit.
backyard landscape prospect. replace in kind (e) 1st floor deck w/ new steps, railings, hot tub integrated into deck w/ new utilities. privacy firewall, privacy wall w/ stucco, tile veneer at west prop. line to 7'-0" w/ new utilities for fire feature. not related to bpa 202508153178.
3rd fl partial ti. non structural partitons, ceilings, fixtures and finishes, w mep.
interior remodel: convert (e) storage room to an excercise room, a media room and a bathroom for unit# 1 above.
floors 3,5,6,7 & 8: m.e.p permit for bpa 202601214251 and 202603026767.
remodel kitchen and bathrooms,remove existing damaged plaster&replace w/5/8 typ x gyp board.electrical and plumbing upgrade throughout.install insulations on exterior walls and ceiling throught.replace exterior windows on back side of house vinyl((9). install 2sliders.
replace sidings, studs, sheetrock, insulation and window frame at back of the house. reference complaint #202659786.
revision to pa # 202605191569 (original kitchen remodel), add steel beam support at mid span and relocate shear wall.
revision to approved pa# 202103025693 and 202308164574. to close doors at first floor level leading to garage level. there is no parking provided to to first unit therefore access is not required.
unit # 32 : bathroom remodel, like for like, no structural changes to layout. replace tub, toilet and plumbing fixtures, can upgrade mep to code as needed. bathroom appx 32sf.
comply with nov 2025051565449: glass replace in-kind; aluminum door replace in-kind; replace post damaged 4x4 post by car @ store front security gate replacement
to obtain final inspection for work approved under pa# 202506189017. all work is complete.
to obtain final inspetion for work approved under pa# 202506188945. all work is complete.
remodel (e) ktichen, bathrooms, laundry room, (n) built interior service stair connecting lower and main level. structural modifications for (n) beam for ktichen remodel to replace (e) load beraing wall. (n) steal beam at garage ceiling to relocate posts
1/f: infill (e) lightwell, new office, new bedroom, new bathroom. relocate (e) bathroom and family room. 2/f: infill (e) lightwell, new rear and side deck. relocate (e) kitchen and bathroom, new half bathroom, new master bathroom.
revision to pa 202204111924 rebuild exteior wood sheathing and stucco on basement floor, rear wall and 1st floor east side wall. rebuild/repair partial retaining wall @ basement floor
2 bathrooms and 1 kitchen remodel in kind like for like. works include upgrade electrical and plumbing to code. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5.
one bathroom remodel. all work inkind. interior painting, flooring refinish, main electrical box replacement and subpanel inside, rewire the unit, new lighting, ev charger installation. new lighting for bathroom remodel shall comply with cec 150.0(k)5. no new wall and no existing wall relocation.
add (1) full bath room at level 1
revision to bpa: 202602276645 - provide ada phone room signages to ada phone rooms 1012 & 1017
remodel kitchen new cabinets, remove and repair drywall caused by water damage in living room, new sheetrock.
mechanical work for tenant improvement on the 4th floor. ref.202604219766
remove and replace 1 window provided pella window, like for like, no structual change. u factor 0.29. street facing window.