Search Permits
251,795 results
Installation of sub-slab depressurization system. No change in use, egress, or occupancy.
REBUILD FRONT PARAPET WALL AS SHOWN ON PLANS.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
SPRINKLER HEAD REMOVALS AND INSTALLATION OF TEMP LOOP AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ELEVATOR PITS AND RAILS.
INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
CONSTRUCTION EQUIPMENT- SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION, LIVE LOAD 300 # PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 BC.
APPLICATION FILED FOR REPAIR AND REPLACEMENT OF GYPSUM BOARDS, FLOORS, DOORS, TILES, PAINTING DUE TO FIRE DAMAGE
Interior renovation of existing third floor apartment
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS. NO CHANGE IN MEANS OF EGRESS.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
INSTALLATION OF TEMPORARY STAGE FOR TPA APPLICATION M01430892-I1. NO PENETRATION OF ANY KIND TO THE BUILDING OR FLOOR NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Brownstone Repairs including cornice painting as well as rear wall coating.
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification to existing HVAC system, including removal & installation of ductwork & piping, installation of VRF heat pump, replacement of diffusers, air outlets, dampers & controls on the 32nd Floor as per plans. No changes to use, egress, or occupancy.
KITCHEN RENOVATION OF APARTMENT 3B ON THE 3RD FLOOR. GENERAL CONSTRUCTION OF 202 SQ FT AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OCCUPANCY, OR ZONING.
EXISTING 4 STORY MIX USED BUILDING WITH INTERIOR RENOVATION PARTITION WORK AT THE CELLAR ,1ST ,2ND ,3RD AND 4TH FLOOR UNDER THIS APPLICATION.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
Install new plumbing fixtures as per plan. There is no change of use, egress, or occupancy filed under this plan
Kitchen Renovations (with minor bathroom updates) - 4F, 5D, 6E, 6M, 11F, 12D
Brooklyn Hospital - Plumbing modifications on partial 1st floor as shown on plans filed herewith. No change in egress, occupancy, or use.
HEREWITH FILE FOR INTERIOR RENOVATION OF EXISTING APT. #2RE LOCATED ON THE 2nd FLOOR. WORK INCLUDES NEW NON-LOAD-BEARING PARTITIONS, PAINT, FLOOR REFINISHING, AND GENERAL CONSTRUCTION THROUGHOUT THE APARTMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
file to plumbing work as per plan with replace toilet, new lavatory, washer, dryer, relocate sink, no change in use ,egress or occupancy.
This application is to capture EUPs that were missing from original MH application M00323842.Application is in conjunction with NB #121206523. Full new building energy package filed under NB # 121206523. Minimal estimated costs used in conjunction with NB
Herewith filing for the installation o a fuel storage Belly Tank and related piping, in conjunction with the installation of an emergency generator, as part of NB Application 122745100.
GAS AND PLUMBING WORK IN PARTIAL APARTMENTS OF 6 STORY EXISTING BUILDING. PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
interior renovation of existing apartment # 8