Search Permits
251,795 results
mechanical
plumbing
building
plumbing
mechanical
electrical
pass test
234
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Build out HVAC system complete with all equipment, ductwork, piping, insulation, controls, accessories and associated work in accordance with code requirements.
APPLICATION IS FILED FOR THE DEVELOPMENT OF ATTACHED 2-FAMILY, 3-STORY RESIDENTIAL BUILDING ON ZONING LOT WHICH CONSISTS OF (6) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
Installation of a suspended scaffold for facade inspection only as per plan submitted. No change to egress or occupancy.
test
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Temporary Construction fence
poas
APPLICATION IS FILED FOR THE DEVELOPMENT OF ATTACHED 2-FAMILY, 3-STORY RESIDENTIAL BUILDING ON ZONING LOT WHICH CONSISTS OF (6) TAX LOTS. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
INSTALLATION OF TEMPORARY BARRICADE WITH FENCE AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
test
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS. NO CHANGE IN MEANS OF EGRESS.
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.