Search Permits
251,795 results
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 15 MODULES, 6.15KW
Sprinkler head changes as indicated on plans.
INTERIOR RENOVATION SCOPE OF WORK AT CELLAR, 1ST FLOOR IN 5 STORY BUILDING. DEMOLITION WORK, CONSTRUCTION AND MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
PMM filed for temporary field offices.
Plumbing Fixture changes as indicated on plans.
REPLACE PACKAGED GAS-FIRED ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposing construction fence as per plans filed no change in use egress or occupancy
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary Loading Platforms. This application involve no change in use, occupancy or egress.
Proposed interior renovation of an existing 2 story and basement with 2 family dwelling. No change in use, egress, occupancy
INSTALL TWO (2) NEW EXHAUST VENTS IN EXISTING MASONRY CHIMNEY AND TWO (2) NEW AIR INTAKE VENTS FOR TWO (2) REPLACEMENT GAS HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical changes as indicated on plans.
HEREBY FILING DIRECT REPLACEMENT OF (3) MECHANICAL UNITS AT ROOF ON EXISTING CURB AS PER PLANS. DOLLAR TREE STORE # 5348
Installation of solar panels, rooftop, grid tied, railed, 10 modules, 4.1 KW
INSTALL NEW PLUMBING FIXTURES AND GAS EQUIPMENT AT CELLAR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Sprinkler work as per plans.
OIL TO GAS CONVERSION AND INSTALL NEW BOILER ROOM. PLUMBING FILED UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Construct new exterior decks with 4" pin pile foundations for existing multi-family structure per plan.
Demolish existing single family residence and detached garage subject to field inspection STFI.
1. Remove existing roofing consisting of 1 layer of composition shingles haul away and dispose.2. Set all fasteners and check for existing structure damage and repair if needed.3. Install 26-gauge 1x3 baked enamel starter metal around the roof to protect fascia and plywood under self-sealing starter strips.4. Install Ice and Water Shield around gutter edge W valleys and penetrations such plumbing pipe flashings and air vents.5. Put down CertainTeed Diamond Deck underlayment over the enti
Remove existing shingles. Replace planned (2) sheets of 1/2" CDX. Install Owens Corning Duration shingles.
Construct interior non-structural alterations to fitness room bathroom for commercial hotel building [SEATTLE MARRIOTT WATERFRONT] per plan.
Demolish commercial building per plan
Construct south two-family dwelling per plan. (Establish use as townhouses per land use code. Construct (2) two-family dwellings per plan. Review and processing for two records under 7093037-CN)
PHASED PERMIT: Construct substantial alterations to a commercial office building for a mixed use - multi-family building occupy per plan. Mechanical included with Phase 2.
Construct addition to one family dwelling per plan.
Demolish existing one family dwelling Subject To Field Inspection
Demolish existing one family dwelling per plan.
Construct north two family dwelling per plans. (Establish use as townhouses per the land use code. Construct (2) two-family dwellings per plans. Reviews and processing for (2) -CN's under 7092928)
Remove the existing single-ply roofing system and install a new mechanically attached 60-mil grey TPO roofing system. Replace up to seven (7) sheets of damaged roof sheathing as needed install a two-layer fire-retardant underlayment replace four (4) roof scuppers install new perimeter metal coping and flash all roof penetrations and details.