Search Permits
251,795 results
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
IRA facade inspections as per the plans
construction fence will be placed to protect site during full demolition.
installation of construction fence to protect site during full demolition
Suspended scaffold out rigger installation for Facade restoration works
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF DEBRIS CHUTE AS PER PLANS.
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
installation of construction fence to protect site during full demolition
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A HEAVY DUTY OVERHEAD PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
FACADE RESTORATION, INSPECTIONS
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Replacement of air conditioning units on 11th Floor. no change in use, egress or occupancy.
INSTALL TEMPORARY 8 FEET HIGH CONSTRUCTION FENCE
INSTALLATION AND USE OF TEMPORARY SHORING EQUIPMENT FOR FIRE ESCAPE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Install illuminated wall sign reading CVS pharmacy
INTERIOR & EXTERIOR RENOVATION OF AN EXIST.MIXED BUILDINGS WORK ON 1ST FLOOR AND ROOF WITH NEW PARTITIONS, DOOR ,REPLACE STOREFRONT, REPAIR FLOOR , CEILING, PAINTING AND INSTALL EXHAUST FAN ON ROOF, NO CHANGE IN USE, EGRESS OR OCCUPANY.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - SPEAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Interior renovation work for Jelly Cat space in the FAO Schwartz store on 1st floor to include new partitions, finishes, counter and display areas. No change to use, egress or occupancy is involved.
Seasonal pergola accessory to Tavern on The Green on the south terrace.
sprinkler modifications taking place on the 8th fl per plans filed herewith. no change in use, egress or occupancy.
Installation of suspended scaffold for facade inspection/repair.