Search Permits
251,201 results
APPLICATION FILING TO MINOR REPAIR INCLUDING RE-POINTING, FACE BRICKS REPLACEMENT, REPLACE ANGLE LINE AT FRONT FACADE AS PER PLAN TO SUPERSEDE JOB# B01157080-I1. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
Modifications to the existing HVAC System: Remove existing AC Unit and Install new unit and associated equipment and ductwork on the SC2 (CO)/ C3 (Mktg) and SC3 (CO)/ C4 (Mktg) Levels as per plans (Truck Lift Modernization.)
HEREWITH FILING FOR INTERIOR RENOVATIONS OF APT 6H AND 15B AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Renovation of existing Unit 6JKL on 6th floor. Partition work as per plan. No change in use, occupancy or exit.
NEW CONSTRUCTION FENCE
INTERIOR RENOVATION OF EXISTING RETAIL STORE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALL NEW CHIMNEY LINER WITH EXTENSION OFFSET AND NEW BOILER BREECHING.
INTERIOR BUILDOUT OF A RETAIL SPACE INCLUDING THE INSTALLATION NON-LOAD BEARING PARTITIONS ALONG W/ FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN.
PLUMBING RENOVATION (NEW AND RELOCATED BATHROOMS), NEW DISHWASHER AND WASHER, NEW KITCHEN SINK. IN NEW APARTMENTS 2nd Floor (apt 201-A, 201-B and 201-C), 8th Floor, (apt 803-A and 803-B) 10 Floor (apt 1002-A and 1002-B), 11 Floor (apt 1102-A and 1102-B)
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 44TH FL (64 M). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work for Howden space on construction floor 42 (marketing floor 53)
REAR FACADE WALL REPAIR (2ND-3RD FLOORS) AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Demolition and restoration of the existing 3rd Floor office buildout at Major League Soccer's (unit 33) existing 420 5th Avenue office, per lease requirement. No change to use, egress or occupancy.
Construct new SE one family dwelling per plan. (Establish use as housing for two attached dwelling units per land use code. Construct (3) new one family dwellings and (1) two family dwelling per plan. Review and processing for two records under 7121127-CN)
Construct West two family dwelling (SFR A/B) per plan. (Establish use as housing for attached and detached dwelling units per land use code. Construct (1) two family dwelling and (2) one family dwellings per plan. Review and processing for 3 records under 7121899-CN)
Construct alterations to kitchen/dining portion of a condominium unit per plans
Construct alterations at basement level of one-family dwelling subject to field inspection [STFI].
Construct alterations at main level kitchen and living areas of one-family dwelling subject to field inspection [STFI].
Demolish existing one family dwelling per plan.
Construct alterations to existing one family dwelling per plan.
Construct alterations for mechanical rooms and generator yard on the 1st and 2nd floors of multifamily building (St Joseph's Residence) occupy per plan.
Construct new NW one family dwelling per plan. (Establish use as housing for two attached dwelling units per land use code. Construct (3) new one family dwellings and (1) two family dwelling per plan. Review and processing for two records under 7121127-CN)
Construct new SW one family dwelling per plan. (Establish use as housing for two attached dwelling units per land use code. Construct (3) new one family dwellings and (1) two family dwelling per plan. Review and processing for two records under 7121127-CN)
Construct interior non-structural alterations to convert portion of adjacent office space into expansion of fitness center tenant space at 1st floor level of commercial office building subject to field inspection [STFI].
Construct blanket permit tenant improvements to Amazon SEA37 on the fifth floor of existing commercial building per plan.
Construct interior only tenant improvement on Level 5 to install (2) phone booths. Subject to field inspection-STFI
We are removing the current composition shingles. We will replace decking as necessary with new 1/2" cdx however no replacement is planned at this time. We will install new underlayment and then new composition shingles. This is a like for like replacement with no structural changes.
Demolish existing residence and all accessory structures subject to field inspection (STFI).
Construct alterations and deck additions to existing single family dwelling per plan.