3rd fl - mech work ti ref pa 202607064544
revision to bpa 202504285334 and 202501168489. updates to t24.
replacing bottom trim at the front of the house.
23rd floor/suite 2350 - mechanical and electrical for project 202605121089
rear retaining wall replacement
45/fl-scope of work on suite 4550 conisits of united interior demo and construction of non structrual elements including but not limited to interior partitions, electrical, doors, finishes, ceilings and lighting electrical and plans will be submittedas a deferred permit. ref 202303103491 and 2026072
to obtain final inspection for work approved under pa# 200607055663 & 200608119221. all work is complete.
ground floor: ti to existing space for studio retail.
to comply with physical inspection report #cc-8762.
revision to 202405091826 & reference 202601153915 new fire rated wall detail at property line wall due to siding change approved in permit ending 3915. new gas utility & meters installed on west exterior wall. (n) fire rated door between garage and hallway. new door between office and loading dock
work only at front bldg. no work on cottage (rear bldg). 2/f: horizontal additions at sideyards to enlarge dining room. add new laundry. 2 new windows at rear bldg wall. 3/f: horizontal additions at sideyard to enlarge bedroom and add new closet. 4 new windows. at roof: 5 new skylights.
install 1/2" cdx plywood on roof. ref bldg-26-1465 reroofing permit.
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).
unit 6: (1)kitchen (81sf) and (1) bathroom remodel (50sf). no wall moving, keeping same layout on everthing. update electrical wiring in the unit with new sub-panel. new updated light fixtures througout the unit.
unit 3: remodel 2 bathrooms and 1 kitchen like for like. install new insulation in walls in living room, kitchen, dining room, and bathrooms. all work interior. add new subpanel, replace fixtures in kind.
remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n)stairs to basement,(n)primary bath,remodel(e)full bath & add(n)laundry@2nd level
change existing tub into shower, new tile, new trim, valve in bath # 1. in bath #2 in-kind new tile, new bath faucents in same location
construct one non-structural interior partition with door to divide (e) living room into a bedroom and non-sleeping alcove. no structural, exterior or facde work, no plumbing, electrical work under separate permit.
unit #205: rebuild bathroom due upper unit water leak. replace plastic surrounding shower wall & tub. replace shower valve & trim. repair sheetrock at walls & ceiling as needed. repair in-kind.
g/f: minor interior t.i. to staff & program space: demo & relocate 1) non load bearing wall, demo of e) linoleum flooring & replacement w. new carper & limoleum in 2 offices & 1 classroom, new interior storefront doors tied into e) access control, mep under separated permit
kitchen remodel, new cabinets, new sink, new counter tops, replace plumbing and electrical updates as needed.
demo only all existng floor coverings, remove all drywall on ceiling and walls up to 10" for future restaurant buildout
the proposed project generally consists of the addition of a roof deck to the rear 4th sloor and motarized operable skylight assembly to an existing 4 story over basement single family residence. revision to bpa 201704285244 addendum 1 & 2.
11/f: selective demolition of non-load-bearing partitions. removal of power and data outlets, lighting, switches, and associated electrical devices including removal of suspended ceiling tiles, grid, and related ceiling mounted devices, except smoke control devices as well as removal of (e)
electrical
mechanical
mechanical
electrical
mechanical
electrical