Search Permits
251,201 results
INSTALL OUTRIGGER SUSPENDED SCAFFOLDING DURING BALCONY REPAIR WORK
Convert existing office building into art gallery. Work includes general construction and installation of new egress stairs. Building will be occupied by a single tenant. GC demolition work previously filed under application M01292601-I1 for $1,225,000
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILE MS SUBSEQUENT WORK TYPE FOR INSTALLING MECHANICAL AC AND CONDENSOR UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW WATER/SANITARY AND GAS PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
Install of temp tent, net and hoop, no alt to exist structures for Essentia - Times Square Pedestrian Plaza. TPA not required. Prod is responsible to monitor site safety & implement HWAP. All production equipment removed upon event complete
STORE RENOVATION (ZARA) WORK TO INCLUDE PARTITION, CEILING AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing herewith plumbing modifications as indicated on plans. No change in use egress or occupancy.
Installation of suspended scaffolds for facade repair & inspection.
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Mechanical work as shown on plans subsequent to GC.
Installation of new 5-ton heat pump unit on new roof supports for suite 405.
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
HEREWITH FILING FOR A NEW STORAGE SHED ACCESSORY TO A SINGLE FAMILY DWELLING
Interior demolition of house in preparation for work filed in B01361174-I1.
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
INTERIOR RENOVATION TO PROVIDE REPAIR FOR WATER AND MOLD DAMAGE DUE TO WATER LEAK. ROOF COVER REPAIR DUE TO WATER LEAK. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
APPLICATION FILED HEREWITH FOR A TEMPORARY CONSTRUCTION OFFICE AND SHANTIES ON THE GROUND FLOOR AND SECOND FLOOR OF A 33 STORY BUILDING. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
INSTALL NEW CABLE SUPPORTED ORNAMENTAL FLEXIBLE STAINLESS STEEL WIRE MESH NETS IN EXISTING STAIRWELL C. NO CHANGE TO THE USE, OCCUPANCY OR EGRESS IS PROPOSED UNDER THIS APPLICATION.
UBIQUANT-- General construction for office remodel as per plans filed. No change to use, egress, or occupancy.
installation of replacement / new PTAC units. Unitizing base building exhaust systems. No change to use or egress.
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
FN/730K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# B01234091 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Install temporary construction fence during construction activites as per plans filed. Filed in conjunction with proposed new building.
Mechanical work associated with renovations to existing three family building. No chnage in occupancy, use or egress.
Plumbing work as per plans filed